100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Asphalt Paving GC Exam Test with 100% Verified solutions| Graded A+ $13.24   Add to cart

Exam (elaborations)

Asphalt Paving GC Exam Test with 100% Verified solutions| Graded A+

 1 view  0 purchase
  • Course
  • E.X.A.M
  • Institution
  • E.X.A.M

Asphalt Paving GC Exam Test with 100% Verified solutions| Graded A+

Preview 3 out of 25  pages

  • October 16, 2024
  • 25
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • E.X.A.M
  • E.X.A.M
avatar-seller
Examsplug
Asphalt Paving GC Exam Test with
100% Verified solutions| Graded A+

Make transverse construction joints whenever placing of concrete is suspended longer than _____
minutes - ✔✔30 minutes




Ensure final sealed surface width of newly constructed longitudinal and transverse contraction joints is
_____ inch - ✔✔3/8"




If calcium is used in non-reinforced concrete during cold weather, do not exceed ______ % - ✔✔2%




Water reducer may be used to increase slump of concrete - ✔✔True




Use procedures for mass concrete placement for a pour that has dimensions of _____ feet or greater in
_____ different directions - ✔✔5, 3




In hot weather, do not allow mass concrete mix temperature measured at discharge into the forms
to exceed ______ degrees - ✔✔80 degrees

,Wet-cure surface of bridge decks for minimum of - ✔✔7 days




Wet-cure structural concrete other than bridge decks for period of ____ days and cover with curing
blankets - ✔✔4 days




Do not remove forms in less than ______ hours, nor more than 48 hours - ✔✔5 hours




Wait a minimum of ____ hours between placing footing or driller pier concrete and erecting column
forms - ✔✔12 hours




Wait a minimum of ___ hours between placing footing or drilled pier concrete and placing column forms
- ✔✔24 hours




Allow concrete to cure for _____ days before application of final finishing coat - ✔✔28 days




When grinding and texturing bridge decks do not allow depth or grinding to exceed ______ inch -
✔✔1/2"




When grinding and texturing bridge decks do not allow depth or grinding to encroach upon the
required rebar cover by more than ______ inch - ✔✔1/2"




Set all steel armor plates, strip seal joints plates, steel finger joint plates, at ____ below finished
roadway elevation - ✔✔1/4"

, After accurately placing reinforcement bars, hold them together by tie wire at all intersections except
where the spacing is _____ or less in each direction, in which case tie alternative intersection - ✔✔12"




Curing prestressed concrete may be by the moist curing method or accelerated curing with low
pressure steam or radiant heat - ✔✔True




For timber driven pile foundation use treated - ✔✔Southern Yellow Pine




Provide a cleaning operation so that a minimum of 50% of the base of each excavation has less than
_____ inch of sediment at the time of placement of the concrete - ✔✔1/2"




Construct concrete C&G in uniform 10' sections except where shorter sections are necessary, but ensure
no section is less than _____ feet in length - ✔✔4'




Backfill concrete gutters so that the earth materials are a minimum of _____ inch above the concrete -
✔✔1"




When monitoring compaction for HMA, conduct in-place density tests at least every _____ feet per
paving lane width by conducting density-gauge tests at randomly selected locations - ✔✔500'




When monitoring the compaction process for HMA, test at least ______ feet from any unsupported
edge - ✔✔1'




_____ is a by-product in the production of electricity from burning coal - ✔✔Fly ash

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Examsplug. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.24. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76799 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.24
  • (0)
  Add to cart