ENCE 325 Final Exam Questions With Verified Answers. UMD is a public university that recently completed a bidding process for a new academic center. Most of the bid documents will become _____ that define the legal terms of the contract. The contracts between GC's and subcontractors typically r...

[Show more]

Preview 2 out of 5  pages

  • October 16, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ENCE
  • ENCE
avatar-seller
sirjoel
©SIRJOEL EXAM SOLUTIONS
10/7/2024 11:03AM



ENCE 325 Final Exam Questions With
Verified Answers.


UMD is a public university that recently completed a bidding process for a new academic center.
Most of the bid documents will become _____ that define the legal terms of the contract. The
contracts between GC's and subcontractors typically reference these documents. -
answer✔Contract Documents
A variety of separate documents typically comprise the contract documents. Select all of the
following that are generally included - answer✔General Conditions, Agreement, Drawings and
Specifications, Agenda and Modifications (NOT Differing Site COnditions)
The agreement consists of facts about the project, and it is the most important document taking
precedence over all others. It provides the GC an opportunity to identify problematic or ill-
defined items that they don't want to be responsible for. These items are referred to as ______. -
answer✔Exclusions
General COnditions outline the rights and responsibilities of the Owner, Designer, and
Contractor. For vertical construction (buildings), the AIA provides a standard form of General
Conditions in "A201" including 15 articles addressing the terms for changing work, procedures
of Contractor Payment, dealing with disputes and delays, and more. Select all of the other
applicable articles in "A201"` - answer✔General Provisions, Protection of Persons and Property,
Insurance and Bonds, Termination of Suspension of the COntract (NOT Design Guidelines)
Supplementary Conditions modify the general conditions and add information specific to a
particular job - answer✔true
Specifications are an important part of Contract Documents as they describe in written form
information that cannot be conveyed by Drawings alone. Select all of the applicable aspects of
Specifications that Architects provide for GC's to order the proper products and materials and
accurately assess the labor necessary for work. - answer✔Quality assurance, submittals, quality
of materials and products, special installation requirements (NOT Subcontractor Names and
Numbers)

, ©SIRJOEL EXAM SOLUTIONS
10/7/2024 11:03AM


The COnstruction Specifications Institute (CSI) developed the MasterFormat standard for
organizing contract specifications. Up to the year 2004, MasterFormat provided 16 divisions of
work. What are the two applicable divisions for Concrete and Masonry work? -
answer✔Division 03, Division 04
UMD selects JW builders as the GC to build a new Academic center. Select all of the typical
pre-construction activities the GC will handle before work begins. - answer✔Determining the
means and methods of construction, jobsite layout plan, creating a master construction schedule,
pre-construction meeting (NOT submitting bid estimates)
JW Builders will select a number of different types of insurance to manage their risk during the
job. Select all of the typical types of insurance policies used in construction. - answer✔Worker's
COmpensation Insurance, General Liability Insurance, Builders Risk Insurance (NOT
Professional Liability Insurance)
When UMD Issues a Notice to Proceed (NTP), JW builders will have access to the site and will
know the official start date of construction. - answer✔True
During Construction, JW Builders will have many responsibilities that include which of the
following? Select all that apply. - answer✔Maintaining a safe and clean jobsite, correcting work
rejected by owner or architect, obtaining building permits, submitting payment requests (NOT
hiring design consultants)
The Superintendent of JW Builders will maintain a Daily Job Report that will document the daily
activities and conditions on the jobsite. Select all of the important items that are typically
included in this daily report. - answer✔Material and product deliveries, Number and types of
workers on the job, Equipment on the jobsite, Daily weather summary (NOT Payments by the
owner)
JW Builders will need to provide a number of submittals before and during construction. Among
these are Shop Drawings for anything that requires special fabrication. - answer✔True
Quality Control (QC) refers to measures that assist in verifying the quality of completed work.
Select all of the following measures that JW Builders might use as part of their QC. -
answer✔Submittals, Visual inspection, Tests and inspections (NOT Design Assist)
During fesibility and design, UMD (the owner) and its architect identifies project milestones to
assis the bidding GC's in developing a bid schedule. Select all of the important events that are
typical milestones. - answer✔COntract Award, Substantial Completion, Notice to Proceed (NOT
Steel erection)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller sirjoel. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82956 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart