Name the four fundamental stages of the construction management process after the design stage. - ANSWER Pre-construction, procurement, construction, and post-construction. What are the four distinct stages of the design process? - ANSWER Programming and feasibility, schematic or conceptual desi...

[Show more]

Preview 1 out of 2  pages

  • October 17, 2024
  • 2
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • cosc 153 chapter 5
  • cosc 153
  • COSC 153
  • COSC 153
avatar-seller
shantelleG
COSC 153 Chapter 5 LATEST UPDATE
2024 CORRECT 100%
Name the four fundamental stages of the construction management process after the design stage. -
ANSWER Pre-construction, procurement, construction, and post-construction.



What are the four distinct stages of the design process? - ANSWER Programming and feasibility,
schematic or conceptual design, design development, and contract documents.



How does the quality of the design drawings impact the quality of the construction? - ANSWER The
construction contract calls for the contractor to build the project in accordance with the plans and the
specs. If the plans, specs, or overall design is flawed or something is missing, then the contractor is
obligated to perform as instructed or to bring the flaw or defect to the attention of the architect by
processing a change order. Either way, the owner is left with paying the price for the error and is usually
not happy.



In relation to construction, what is meant by the term due diligence? - ANSWER Process of identifying
any problems associated with the project early on so that those problems can be factored into the
decision making that occurs during the pre-construction stage.

Why is it important to have a clear distinction between the project punchout and the warranty period? -
ANSWER The completion of punchout implies substantial completion of the project. If work items
continue to get added to the punch list, it will be very difficult to clearly mark the end of the project.



Construction documents - ANSWER The final detailed drawings used to build the project. They're also
called working drawings. These final drawings, along with the full project manual, specifications, and
agreement forms are together referred to as the contract documents.



As-built drawings - ANSWER Record drawings completed by the contractor and turned over to the owner
at the end of the project identifying any changes or adjustments made to the conditions and dimensions
of the work relative to the original plans and specifications.



Unforeseen conditions - ANSWER Unknown physical conditions at the site that were not anticipated by
the owner or the contractor.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller shantelleG. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82956 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart