How team members are Project Delivery System
organized, establishes
when parties engage,
determines roles of
parties, and determines
sequence of design,
procurement, and
construction (db, cmar,
dbb)
how team members are Procurement Method
selected (QBS, best
value, low price, sole
source)
how team members are contracting approach
paid (fp, gmp, cost
reimbursement, target
price, unit price)
https://quizlet.com/959033291/dbia-testdbia-test-questions-and-answers-with-complete-solution-frequently-most-tested-questions-2024-2025-up… 1/27
,10/18/24, 8:30 AM DBIA Test/DBIA Test Questions and Answers with complete solution/ frequently most tested questions/ 2024-2025 update Fla…
linear, sequential Design-Bid-Build (DBB)
process, A/E selected on
qualifications, GC
selected on low price,
design is fully completed
without input from GC,
A/E acting in owner's
interests, with a
historically strong bond,
process is well-
established and
understood
similar org structure to construction manager at risk
DBB, construction
manager selected by
QBS or best value,
contractor provides
precon services,
negotiated gmp
contracting approach,
open book estimating
process, potential to fast
track project,
construction cost
determined before
design completed,
potential issues over
what is reasonably
inferable from gmp
design documents
https://quizlet.com/959033291/dbia-testdbia-test-questions-and-answers-with-complete-solution-frequently-most-tested-questions-2024-2025-up… 2/27
, 10/18/24, 8:30 AM DBIA Test/DBIA Test Questions and Answers with complete solution/ frequently most tested questions/ 2024-2025 update Fla…
The owner contracts with Design-Build
one entity (a person or
firm) to provide both
design and construction
services, designer and
contractor have a direct
contractual relationship,
selected by QBS or best
value, wide spectrum of
contracting approaches
and organizational
structures, single point
responsibility, owner
does not manage
designer, owner
exposure to claims is
significantly reduced
similar to design build, in engineer procure construct (epc)
industrial and power
generation sectors,
systems and
performance testing are
central to scope,
contractor will typically
perform engineering with
its in-house staff, owner
has need for single point
responsibility, contracts
include plant and
process performance
guarantees, contract
items include
performance and
schedule liquidated
damages and limitations
of liability