LARE Test Questions 2024/2025 with 100% correct answers
1 view 0 purchase
Course
LARE Tv
Institution
LARE Tv
General correct answersWhat type of specification instructs the contractor on where to deliver and store all of the materials on site?
Certification of Occupancy correct answersIn order for a building to be occupied after construction the local building department must issue this certification
...
General correct answersWhat type of specification instructs the contractor on where to deliver and store
all of the materials on site?
Certification of Occupancy correct answersIn order for a building to be occupied after construction the
local building department must issue this certification
writ of execution correct answersA landscape architect has won a case in small claims court against a
former client. The client has refused to pay the judgment in the case. What action should the landscape
architect take next?
Standard of practice correct answersAll contractors are held to the same expectations in this arena
regardless of geographical distinction or manner of specialization. Veracity of legal cases is ostensibly
determined utilizing this method of reasoning
Reasons to lose license correct answerssealing drawings that he or she has not directly supervised the
creationof, he or she has become mentally disabled, he or she has accepted compensation from a
specific supplier and receiving payments for making public statements without disclosing it to the public.
Construction Administration correct answersthe Landscape Architect must have a great deal of
knowledge in the field and be able to make quick decisions to keep work moving and avoid delays. The
Landscape Architect should always have the owner's best interests in mind. The Landscape Architect is
also responsible for checking the quality of work and making sure it meets code and complies with the
specifications of the contract. Any questions that arise about the drawings or specifications are run
through the Landscape Architect who is responsible for resolving the problem in as quickly a manner as
possible.
The Contractor correct answersWho is responsible for safety on the construction site?
OSHA correct answersOccupational Safety and Health Administration
, Liquidated Damages correct answersan amount that is specified in the contract for any breach of
contract including missing a deadline.
Actual/Compensatory Damages correct answersActual and compensatory damages
restricted covenants correct answersProhibiting dramatic changes to a piece of property
Prevailing Wage correct answersWhen working on a federally funded project, what is the minimum
amount that contractors are required to pay their employees?
Prevailing Wage correct answersan hourly wage determined by a formula that considers the rate paid for
a job by a majority of the employers in the appropriate geographic area
General Warranty correct answersa confirmation that what is stated within an ownership article is actual
fact, and serves to assure that nothing negative was incurred while the owner was in ownership of said
property.
Special Warranty correct answersdeals with a more detailed/limited time frame, precluding the owner
from liability for anything incurred before their actual ownership.
Tort Law correct answersLaw that deals with harm to a person or a person's property.
Mechanical Lien correct answersThe ability to put a lien on an owner to ensure that a supplier of goods
gets paid.
General Warranty Deed correct answersA landscape architect has bought a piece of land for a new office
complex. The previous owner has agreed to remain personally responsible for the title indefinitely. What
type of agreement has been reached?
The Township correct answersA Landscape Architecture Firm is designing a sports complex for
OakleyTownship and has sub contracted some of the work to a civil engineering firm andan architecture
firm. The township has provided project requirements and design standards to the LA firm. During the
design process, the Landscape Architect has noticed that all of the CADD drawings have been coming
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller QUILLSKY. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.99. You're not tied to anything after your purchase.