100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
2024 CODE ENFORCEMENT- COMPREHENSIVE EXAM WITH CORRECT ANSWERS $14.99   Add to cart

Exam (elaborations)

2024 CODE ENFORCEMENT- COMPREHENSIVE EXAM WITH CORRECT ANSWERS

 9 views  0 purchase
  • Course
  • CODE ENFORCEMENT- COMPREHENSIVE
  • Institution
  • CODE ENFORCEMENT- COMPREHENSIVE

2024 CODE ENFORCEMENT- COMPREHENSIVE EXAM WITH CORRECT ANSWERS

Preview 2 out of 14  pages

  • October 21, 2024
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CODE ENFORCEMENT- COMPREHENSIVE
  • CODE ENFORCEMENT- COMPREHENSIVE
avatar-seller
Elitaa
2024 CODE ENFORCEMENT-
COMPREHENSIVE EXAM WITH
CORRECT ANSWERS



Code Enforcement Officer-in-Training - CORRECT-ANSWERSAn agent of this
state or a political subdivision of this state who engages in code enforcement
but who has less than one year of experience in the field of code
enforcement and is supervised by a registered Code Enforcement Officer.

Code Enforcement (Texas definition) - CORRECT-ANSWERSThe inspection,
improvement and rehabilitation of environmental hazards in public and
private premises by determining the presence of fire or health hazards,
nuisance violations, unsafe building conditions, and violations of any fire,
health, or building regulation, statute, or ordinance.

Civil Action - CORRECT-ANSWERSLegal action to protect a private civil right
or to compel a civil remedy (as distinguished from criminal prosecution).

Code Enforcement Officer - CORRECT-ANSWERSAn agent of this state or a
political subdivision of this state who engages in code enforcement and has
one year or more of experience in the field of code enforcement.

What should be the intent of code enforcement with respect to
rehabilitation? - CORRECT-ANSWERSto encourage the rehabilitation and
conservation of older building stock.

One way the housing rehabilitation process originates is... - CORRECT-
ANSWERSas a result of VOLUNTARY DECISIONS on the part of the owner of a
building to conserve the building, rather than demolish it, by making the
necessary improvements to make it a viable structure.

The TWO stages of the process by which codes are changed and updated -
CORRECT-ANSWERSFirst, the codes are CHANGED. Second, the codes are
ADOPTED by each local jurisdiction.


Another way the housing rehabilitation process originates is... - CORRECT-
ANSWERSas a result of a SYSTEMATIC SURVEY throughout the city,
determining which areas and which buildings in each area are in need of
rehabilitation to remove unsafe and unhealthy conditions.

, The TWO types of codes primarily involved in the approach of rehabilitation -
CORRECT-ANSWERSBUILDING and HOUSING codes

Name at least THREE results from a housing inspection - CORRECT-
ANSWERS1. quality measures/changes
2. consultation opportunity
3. effectiveness measures
4. defense against future legal action

Difference between a mobile home and a HUD Code manufactured home -
CORRECT-ANSWERSBefore June 15th, 1976 was called a mobile home.
After June 15th, 1976 called HUD Code manufactured home.
The foundation may also differ.

IRC - CORRECT-ANSWERSInternational Residential Code - By January 1, 2002,
all municipalities (incorporated towns) in the State of Texas had to adopt the
IRC for residential construction.

Projecting Signs - CORRECT-ANSWERSSigns that are installed perpendicular
to or at an angle to a building wall.

Local regulations often include clearance requirements and/or require
owners to furnish proof of insurance in case the sign should fall on someone
walking by.

Pole Signs - CORRECT-ANSWERSSigns that are supported by a POLE (not the
ground)

Window Signs - CORRECT-ANSWERSsome may be permanently painted onto
the window, while others may be temporary paper signs.

Flags - CORRECT-ANSWERSany fabric, banner or bunting containing
distinctive colors, patters or symbols, used as a symbol of a government,
political subdivision, or other entity.

Mansard/Wall Signs - CORRECT-ANSWERSare painted on or attached flush
with a structural wall of a building.

Total sign area may be regulated by... - CORRECT-ANSWERSlimits by the
function of lot area, STREET FRONTAGE, building area, or some combination
of these.

The most basic distinction for signs concerns whether they are ______________
or ______________ - CORRECT-ANSWERSpermanent, temporary

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Elitaa. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart