Erosion is - ANSWER-The process by which the land surface is worn away by the
action of wind, water, and gravity.
Which of the following describes sedimentation? - ANSWER-The settling out of soil
particles transported by water and wind.
The main two types of soil erosion discussed in this training are: - ANSWER-Wind and
water
An example of a physical effect of erosion and sedimentation is: - ANSWER-Increased
flooding.
What are the four factors that influence the erosion potential of an area? - ANSWER-
Soil characteristics, vegetative cover, topography, and climate.
Best Management Practices (BMPs) for erosion and sedimentation control include
which of the following? - ANSWER-Silt fence and soil stabilization.
Projects with which of the following issues could experience an enforcement action and
possibly monetary penalties from regulatory agencies: - ANSWER-Any of the above
When is Construction Generic Permit (CGP) coverage required? - ANSWER-When your
site disturbs over 1 acre or is less than 1 acre and part of a larger project
, What are the concerns when dewatering discharges go offsite? - ANSWER-Turbidity,
erosion, flooding, release of contaminated groundwater and other surface water quality
violations.
What areas should be evaluated during your weekly/rain event inspections? -
ANSWER-All of the above
Which of the following is considered a surface water quality violation? - ANSWER-
Turbidity level is greater than 29 NTU above natural background conditions.
A floating turbidity barrier/curtain is designed to ______sediment laden water and allow
enough _____for sediments to settle out of suspension. - ANSWER-Contain/Time
For proper installation of a silt fence, a trench _____inches deep and ______inches
wide must be excavated. This will allow the _______inches of fabric to be buried. -
ANSWER-4" D x 4" W; 8"
The maximum spacing between check dams should be such that the _____ of the
upstream dam is at same elevation as the _______of the downstream dam. -
ANSWER-Bottom/Top
Within ____ calendar days after your site has achieved final stabilization and all
discharges are eliminated, you must submit your NOT form according to the
Construction Generic Permit (CGP) - ANSWER-14 days
BMP maintenance activities can be classified into categories including __________. -
ANSWER-All of the above
How long does the operator have to update or revise the stormwater pollution
prevention plan (SWPPP) when site conditions have changed? - ANSWER-7 Days
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller NursingTutor1. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.