100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100% $6.49   Add to cart

Exam (elaborations)

CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100%

 5 views  0 purchase
  • Course
  • CMGT - 360 DBIA FUNDAMENTALS OF PROJECT
  • Institution
  • CMGT - 360 DBIA FUNDAMENTALS OF PROJECT

CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100% Hammurabi - Answers ( BC) established the earliest known body of laws written to govern its people which included codes for builders Code of Hammurabi - Answers Obligation of design & construction to society Vitruvius ...

[Show more]

Preview 3 out of 22  pages

  • October 27, 2024
  • 22
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CMGT - 360 DBIA FUNDAMENTALS OF PROJECT
  • CMGT - 360 DBIA FUNDAMENTALS OF PROJECT
avatar-seller
TutorJosh
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100%

Hammurabi - Answers (1795- 1750 BC) established the earliest known body of laws written to govern its
people which included codes for builders

Code of Hammurabi - Answers Obligation of design & construction to society

Vitruvius - Answers * Roman writer, engineer, architect lived in 1st century BC (Roman Empire)

++ He created the original design and construction hand book (De Architectura Libri Decem "10 books of
architecture" -- manufacturer of building materials/roads & bridges/heating water/amplification)

* Credited with transitionong the practice of architecture and engineering to a routine practice

* Established design and construction management as learned professions

Brunelleschi - Answers * Quintessential design-builder and innovator (1377 - 1446)

* Italian Artist-Architect-Builder (1420)

* Master Builders who developed the "dome" concept for the Gothic Cathedral of Florence (the duomo)

* Key figgure in the transition from the Middle Ages to the modern Renaissance area

Middle Ages - Answers Craft training and education

Renaissance - Answers Separate design and construction

Leone Battista Alberti - Answers * First intentional separation of the art from the craft (1456)

* Poet, Philosopher and secretary to the Pope.

* The rise of professionalism: First push to separate design and construction as distinct functions

The Rise of Professionalism - Answers * Established architecture as a profession distinct from the science
of engineering and construction

* From 15th century Renaissance in to 19th century Industrial Revolution, Architects retained
responsibilities for both design and construction

* Industrial Revolution brought on the separation of design and construction

Return to Integration - Answers * DBIA founded in 1993 to help standardize and advocate for an already
emerging design-build industry

* Integrated Project Delivery (IPD)

* Building Information Modeling (BIM)

,* Sustainable Design (Green/LEED)

* High Performance Contracting (LEAN - Toyota Production Model)

Effects of the Industrial Revolution - Answers - Division of Labor: Building professions took on
increasingly defined roles of architects, engineer, and builder

- Entrepreneurship: need fpr architects and engineers to take risk and assure performance and cost of
facilities (construction)

- Need for capital: Responded to need by non-participating owners (stockholders) becoming an integral
part of projects

Professional Societies - Answers • Greater professional specialization

• Increase in specialized knowledge

• Promotion & advocacy of professional

interests & markets

• Ethical standards of practice

• Rise of conflict-of-interest issues

++Middle 19th century there was a clear distinction

had been made between design professionals

and builders

• 1852 American Society of Civil Engineers an

Architects (ASCEA)

• 1857 Architects dropped and American Institute

of Architects (AIA) was formed

++Design professionals wanted to separate

themselves from sometimes corrupt builders

The Miller Act (1935) - Answers ++Public contracting law mandating separation of design from
construction

* Contractor selection solely on lowest responsible bid

, * Existing Federal law requiring any federal project exceeding $100,000 to require two bonds
(performance and a labor and material bond)

* Implemented during World War I and Wold War II to reduce the risk of fraud, favoritism, undue
influence, and reassurance to taxpayers their tax dollars were being spent properly.

* Worked well for a long time... but new procurement methods are on the rise, especially the
construction industry

Professional licensing requirements - Answers * First license laws for Architect licensing initiated in 1897

* Architects, engineers, and contractors are required to be registered as licensed or certificated in most
every state

++Professional license laws do not require design and construction be separate functions

The Advent of Modern Design-Builders - Answers Lack of voluntary cooperation on more demanding
jobsites lead to the advent of new delivery systems:

* Construction managers (CM)

* CM@Risk

*Design-Build (Integrated Project Delivery)

Project Delivery - Answers A comprehensive process including planning, design, construction & other
services, necessary for organizing, executing & completing a building facility or project (method to
organize, execute and complete a project)

Three fundamental Owner decisions - Answers Delivery system, Procurement method, and contract
format (Developing the "Acquisition Strategy)

Importance of the Project Delivery Method - Answers *Establishes when the parties become engaged

* Influences the choices of contractual relationships among the parties (determines how the parties
constructing the project will interact with each other)

*Influences ownership & impact of changes & modifications of project cost (determines the best
method to ensure the Owner's project objectives are met while at the same time allowing the project to
be completed on time within budget)

3 basic parties involved in the project delivery process - Answers Owner, Designer, and Contractor

Familiar Project Delivery Methods - Answers * Design-Bid-Build (D-B-B) sometimes called "Traditional",
most common and familiar delivery method

* Multiple Prime (M-P)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TutorJosh. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $6.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$6.49
  • (0)