100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Certification Test Questions and Answers- Concrete Field Testing Technician Grade 1 CP-1 (12) $16.99   Add to cart

Exam (elaborations)

ACI Certification Test Questions and Answers- Concrete Field Testing Technician Grade 1 CP-1 (12)

 5 views  0 purchase
  • Course
  • ACI
  • Institution
  • ACI

ACI Certification Test Questions and Answers- Concrete Field Testing Technician Grade 1 CP-1 (12)

Preview 3 out of 18  pages

  • October 27, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ACI
  • ACI
avatar-seller
Zanaya
ACI Certification- Concrete Field Testing
Technician Grade 1 CP-1 (12)




ASTM C1064 - Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement
Concrete



The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into
the freshly mixed concrete. - Answer-3"



The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to ± ______ °F throughout a range of ____________. - Answer-1 degree, 30 degrees to 120
degrees



The temperature measuring device shall be calibrated ______ , or whenever there is a question of
______ . - Answer-Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer-True

,The temperature of concrete may be measured in a wall form. True or False? - Answer-True



What must be done to the sample container prior to sampling the concrete? - Answer-Dampen with
water



What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete? - Answer-Close off air voids by gently pressing the concrete around
the device



How long must the temperature measuring device remain in the freshly mixed concrete? - Answer-
minimum of two minutes, maximum of five minutes



The temperature of the concrete is reported to the nearest ______ °F - Answer-1 degree



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - Answer-
False



ASTM C172 - Answer-Standard Practice for Sampling Freshly Mixed Concrete



Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - Answer-Compliance



This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and _____ . -
Answer-Stationary mixers, paving mixers, revolving drum mixers and open top mixers



The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - Answer-15

, Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. True
or False? - Answer-True



The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - Answer-5



The molding of strength test specimens shall begin within _____ minutes after fabricating the composite

sample. - Answer-15



The concrete sample must be protected from contamination and _____. - Answer-Rapid evaporation



The minimum size sample for making strength test specimens is _____. - Answer-1 cubic foot



When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced
intervals during discharge of the middle portion of the batch. - Answer-2



The composite sample for a paving mixer must represent a minimum of _____ different portions of the
batch of concrete taken from the pile after discharge. - Answer-5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of the batch. - Answer-2



Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the
mixer at the job site. True or False? - Answer-False



The composite sample from a truck mixer must be obtained from the _____ portion of the batch. -
Answer-middle

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zanaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.99
  • (0)
  Add to cart