CESSWI Certification PART I Exam Study Guide with complete solutions (Updated) |Latest 2024/2025
0 view 0 purchase
Course
CESSWI
Institution
CESSWI
Cesswi stands for Certified Erosion, Sediment, and Storm Water Inspector
A Cesswi is qualified to perform inspections in one or more of the following areas: Construction
Post Construction
Industrial/ Multi-sector
Municipal (MS4)
Hazardous Materials: Chemical Compounds - SDS, MSDS, PS...
PSDS available ( provides proper procedures for handling or
i.- i.- i.- i.- i.- i.- i.- i.- i.-
working with a substance or compound)
i.- i.- i.- i.- i.-
Hazardous Materials: combustible/ flammable - be aware of
i.- i.- i.- i.-i.- i.- i.- i.- i.- i.-
safety requirements for open flames, sparks, electrical and others
i.- i.- i.- i.- i.- i.- i.- i.-
Hazardous Materials: Blasting and Explosives i.- i.- i.- i.- i.-i.- i.- - no smoking
i.- i.- i.-
near stored explosives as is dangerous
i.- i.- i.- i.- i.-
,Hazardous Materials: Spill Prevention i.- i.- i.- i.-i.- i.- - All sites should have a
i.- i.- i.- i.- i.- i.-
process in place for minimizing spills i.- i.- i.- i.- i.- i.-
- A spill prevention, control, and countermeasure (SPCC) plan
i.- i.- i.- i.- i.- i.- i.- i.- i.-
may be necessary i.- i.- i.-
- spill kits
i.- i.-
Hazardous Materials: Utilities Signage - verify all utilities and i.- i.- i.- i.-i.- i.- i.- i.- i.- i.- i.-
tanks are marked and located so you can avoid contact
i.- i.- i.- i.- i.- i.- i.- i.- i.-
Cesswi professional are required to accumulate a minimum of
i.- i.- i.- i.- i.- i.- i.- i.- i.-
____ professional development hours (PDHs) over a ____ year
i.- i.- i.- i.- i.- i.- i.- i.- i.-
period to maintain their credential 6; 1
i.- i.- i.- i.- i.-i.- i.- i.-
PDH requirements i.- i.-i.- i.- Not to exceed annual requirement
i.- i.- i.- i.-
Can only carry over to the immediate next cycle
i.- i.- i.- i.- i.- i.- i.- i.-
Types of Permitting Authority i.- i.- i.- i.-i.- i.- NPDES Program i.-
Permit Application Methods - Filing a NOI (Notice of intent)
i.- i.- i.-i.- i.- i.- i.- i.- i.- i.- i.- i.-
to be covered under an EPA or state general permit
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
- Filing an individual permit application with EPA or state
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
permitting authority i.-
,Notice of Intent (NOI) i.-Informs permit writers that the site
i.- i.- i.-i.- i.- i.- i.- i.- i.- i.- i.-
falls within scope of the regulations
i.- i.- i.- i.- i.-
What information is provided in an NOI for general permit
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
coverage? - a brief description of the project
i.-i.- i.- i.- i.- i.- i.- i.- i.-
- an estimated timetable for major activities
i.- i.- i.- i.- i.- i.-
- estimates of the number of acres of the site on which soil will be
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
disturbed
- a certification that the SWPPP provides compliance with
i.- i.- i.- i.- i.- i.- i.- i.- i.-
approved state or local erosion and sediment control plans or
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
stormwater management plans i.- i.-
Deadlines: Phase 1 i.- i.- i.-i.- i.- - any disturbance of five acres or more
i.- i.- i.- i.- i.- i.- i.-
- applications for stormwater permits must be filed at least a
i.- i.- i.- i.- i.- i.- i.- i.- i.- i.- i.-
week prior to construction
i.- i.- i.- i.-
- SWPPP must be prepared before the NOI
i.- i.- i.- i.- i.- i.- i.-
Deadlines: Phase 2 i.- i.- i.-i.- i.- - any disturbance of one acre or more but
i.- i.- i.- i.- i.- i.- i.- i.- i.-
less than five
i.- i.- i.-
- Same as Phase 1
i.- i.- i.- i.-
, Clean Water Act (CWA)
i.- Enacted in 1972 by EPA; Intent of
i.- i.- i.-i.- i.- i.- i.- i.- i.- i.- i.- i.-
restoring and maintaining the chemical, physical, and biological
i.- i.- i.- i.- i.- i.- i.- i.-
integrity of the waters of the US
i.- i.- i.- i.- i.- i.-
CWA section 402
i.- i.- i.-i.- i.- Established NPDES i.-
CWA Section 404
i.- i.- i.-i.- i.- Regulates impacts to waters of the US i.- i.- i.- i.- i.- i.-
CWA section 401
i.- Regulates water quality impacts and state
i.- i.-i.- i.- i.- i.- i.- i.- i.- i.-
certification programs (ex. DEQ) i.- i.- i.-
CWA Section 303
i.- i.- i.-i.- i.- Established water quality standards (Ex. i.- i.- i.- i.- i.-
TMDL)
NPDES prgram was created to:
i.- control the discharges of i.- i.- i.- i.-i.- i.- i.- i.- i.- i.-
pollutants from defined point sources
i.- i.- i.- i.-
NPDES originally focused on:
i.- industrial waste water and i.- i.- i.-i.- i.- i.- i.- i.- i.-
publicly owned treatment works (POTWs)
i.- i.- i.- i.-
CWA section 404 regulates the discharge of:
i.- i.- i.- i.- i.- i.- i.-i.- i.- dredged or fill i.- i.- i.-
material into the waters of the US
i.- i.- i.- i.- i.- i.-
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller AcademiaExpert. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.