100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CEPSCI Practice Test: Questions With Solutions (A+) $8.99   Add to cart

Exam (elaborations)

CEPSCI Practice Test: Questions With Solutions (A+)

 5 views  0 purchase
  • Course
  • CEPSCI
  • Institution
  • CEPSCI

CEPSCI Practice Test: Questions With Solutions (A+)

Preview 2 out of 13  pages

  • October 29, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CEPSCI
  • CEPSCI
avatar-seller
Zendaya
CEPSCI Practice Test: Questions With Solutions (A+)

1972 clean water act Right Ans - Administered by the US environmental
protection agency (EPA) Created the NPDES

1987 Right Ans - Amendment to CWA CALLED WATER QUALITY ACT

NPDES in South Carolina Right Ans - South Carolina is NPDES delegated
state.

NPDES regulations are administered by Right Ans - SCDHEC

CGP authorizes Right Ans - storm water discharges from construction sites

Who must obtain NPDES coverage Right Ans - land disturbing activities
greater than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal
zone

NPDES permits are issued to Right Ans - operator-person or company for a
particular discharge

Primary permittee Right Ans - -has day to day operational control to
ensure compliance with SWPP
-typically the owner or developer

Primary permittee responsibilites Right Ans - submit NOI, Preparation of
the C_SWPPP

Secondary permittee Right Ans - individual lot owner or residential builder
that conducts land disturbing activity limited to an individual lot or group of
lots as part of approved LCP of development

Contractors Right Ans - must on Contractor Certification- D-0437

On-Site SWPPP Right Ans - SCDHEC CGP, NOI, NPDES coverage approval
letter, Contractor Certifications, Local Approvals, USACE approvals, Critical
area permit(coast)

, OS_SWPPP Right Ans - a copy of signed and certified SWPPP, NOI, and CGP
coverage letter from DHEC must be retained at site or electronically accessible

Minor modification to ON-SWPPP Right Ans - minor modifications made
directly in the field,do not need approval by DHEC- additional BMP's, removal
of disturbed areas

Major modifications to OS-SWPPP Right Ans - must be made by qualified
individual and submitted to DHEC or appropriate delegated entity for
approval

Phased plan requirement > 5 Right Ans - include a phased stormwater
management plan which identifies all BMP's and grading work conducted
during a specific portion of the sites construction sequence. Each phase
identified on at least one separate plan sheet.

Phased plan requirement < 10 but > 5 acres Right Ans - at least two
separate plan phases are required - initial land disturbance phase -
stabilization phase

Phased plan requirement ≥ 10 acres Right Ans - at least 3 separate plan
phases are required - initial land disturbance phase - construction phase -
stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the
following Right Ans - 1. areas of site disturbed by construction activity and
areas used for storage of materials exposed to precipitation
2. Storm water conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations
are inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Inspection frequency after construction begins Right Ans - at least once a
week or within 24 hours of end of storm event >0.5 inches

Inspection frequency for sites that have reached temporary stablization
Right Ans - Once every month

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zendaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.99
  • (0)
  Add to cart