CEPSCI Exam 2024: Questions & Accurate Answers

Preview 2 out of 8  pages

  • October 29, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CEPSCI
  • CEPSCI
avatar-seller
Zendaya
CEPSCI Exam 2024: Questions & Accurate Answers

Storm Water Runoff Measures Right Ans - Pipe Slope Drain
Runoff Diversion Measures
Temporary Stream Crossing
Construction De-Watering
Buffers and Flow Control

PIpe Slope Drain Right Ans - Pipe slope drains are used when it is
necessary for water to flow down slope without causing erosion, especially
before slope is been stabilized or before permanent drainage structures are
installed.

Pipe Slope Drain: Pipe Seperates Right Ans - Reconnect pipe sections.
Securely anchor and stabilize pipe into soil. Ensure pipe joints are water tight.

Pipe Slope Drain: Pipe Outlet Erodes Right Ans - Repair the damage and
stabilize the outlet with a flared end section, riprap, TRM or velocitiy
dissipation device. If necessary, reduce flows being discharged

Pipe Slope Drain: Pipe Becomes Clogged Right Ans - Flush out pipe. Place a
screen or grate at inlet to capture trash and large particles.

Runoff Diversion Measures Right Ans - - Diversion dikes and berms (ridges
of compacted soil) used to divert upslope clean water runoff from crossing
areas with high risk of erosion
- Temporary silt ditches or swales (excavated depressions) used to direct
sediment laden runoff unto sediment control BMPs.

Runoff Diversion Measures Installation Right Ans - Clear and grub all
objects in path of structure. Ensure minimum constructed cross section meets
all dimensions shown on plans
Construct and stabilize using vegetation, sod, and ECBs or TRMs before any
major land disturbing activity takes place
Minimize construction traffic over dikes or berms
Inspect diversion dikes and silt ditches after specified intervals

Runoff Diversion Measures: Trouble Shooting
Dikes Wash Out

, Area Behind Dikes Erode
Concentrated Flow Causes Erosion
Ditches and Swales Erode Due to High Velocity Flows Right Ans - 1.
Regrade, compact, and stabilize the soil used to build earthen dikes
2. Stabilize the area. Use other BMPs to stabilize the uphill side of the dike
3. Stabilize area and use check dams, ECBs, TRMs, or riprap to prevent erosion
4. Stabilize and use check dams, ECBs, TRMs, or riprap to prevent erosion

Temporary Stream Crossing Right Ans - Typically a bridge or culvert
erected to cross a running watercourse

Construction De-watering Right Ans - - Construction de-watering involves
removing storm water or ground water from bore pits, trenches and other
excavations
- Removal of water usually involves pumping water to appropriate receiving
area such as a sediment basin, sediment trap, or geotextile filter bag.

Construction De-watering Inspection/Maintenance Right Ans - Ongoing
inspection is necessary to detect any issues, discharge areas should be
inspected when other practices are inspected

Construction De-watering: Troubleshooting
Discharge or treated water causes erosion
Treatment unit fills with sediment
Dewatering discharge flow is higher than expected
Water spread on the construction site is not infiltrating fast enough and is
entering the storm drain system or receiving water body Right Ans - 1.
Install outlet protection or velocity dissipation device
2. Remove sediment when unit reaches 1/3 its capacity to preserve settling
efficiency
3. Stop dewatering. Install sediment treatment system and test discharge as
necessary

Buffer Zones Right Ans - Provide and maintain natural buffers around
surface waters during construction activities

Buffer zones are located Right Ans - Between surface waters and the
outermost sediment and erosion controls at the site

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zendaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart