100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CEPSCI Certification (Certified Erosion Prevention And Sediment Control Inspector) – Questions & Answers $12.99   Add to cart

Exam (elaborations)

CEPSCI Certification (Certified Erosion Prevention And Sediment Control Inspector) – Questions & Answers

 5 views  0 purchase
  • Course
  • CEPSCI
  • Institution
  • CEPSCI

CEPSCI Certification (Certified Erosion Prevention And Sediment Control Inspector) – Questions & Answers

Preview 2 out of 13  pages

  • October 29, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CEPSCI
  • CEPSCI
avatar-seller
Zendaya
CEPSCI Certification (Certified Erosion Prevention And
Sediment Control Inspector) – Questions & Answers

Why erosion prevention and sediment control are important? Right Ans -
1. Storm water runoff is leading cause of impaired water in SC. 2. Protect
downstream surface water and aquatic habitats

Erosion Right Ans - Process by which land surface is worn away by action
of water, wind, ice and gravity.

Natural erosion Right Ans - aka Geologic erosion. 1. relative slow 2. most
rapid along shorelines and stream channels 3. produces about 30% of eroded
sediment in US

Accelerated erosion Right Ans - 1. erosion at elevated rate bc of human
activity 2. agriculture, timber harvesting and construction are primary
contributors 3. accounts for remaining 70% of eroded sediment in US

Factors influencing erosion Right Ans - 1. climate (frequency, intensity and
duration of rainfall for a region) 2. season (more intense storms in summer) 3.
vegetative cover 4. topography 5. soil characteristics (texture, percentage of
organic content, structure, and permeability)

Sedimentation Right Ans - Process by which eroded material is transported
and deposited.

Negative impacts of sedimentation Right Ans - 1. screens out
sunlight/reduces water clarity. 2. fills channels and reduces capacity. 3.
pollutants attached to sediment particles can impact downstream water
quality.

NPDES Right Ans - aka National Pollutant Discharge Elimination System.
Created by the 1972 Clean Water Act.

1987 Right Ans - Amendment to CWA called Water Quality Act required
EPA to develop program to regulate storm discharges under NPDES program.

, Point source pollution Right Ans - Discharges from readily identifiable
sources such as wastewater treatment plants or industrial facilities.

Nonpoint source pollution Right Ans - Discharges that are less easily
identifiable such as runoff from urbanized or agricultural areas.

DHEC Right Ans - aka Department of Health and Environmental Control.
This regulation administers NPDES regulations, but EPA has authority to exert
jurisdiction in SC.

CGP Right Ans - aka Construction General Permit. One of several NPDES
permits administered by DHEC.

Who must obtain NPDES coverage? Right Ans - 1. land disturbing activities
greater than or equal to 1 acre. 2. land disturbance less than 1 acre within half
a mile of a receiving water body in SC Coastal Zone. 3. Exception: SFR
development NOT part of larger common plan of development.

Who is permitted? Right Ans - NPDES permits are always issued to
operator (person or company) for a particular discharge. NOT issued to parcel
or project.

Authorization of Discharges Right Ans - To receive coverage under permit,
appropriate Notice of Intent (NOI) form must be completed and submitted.
There are 3 types of NOIs and dependent on the Operator Category (refer to
chart).

Primary permittee Right Ans - 1. has operational control over Stormwater
Pollution Prevention Plan (SWPPP), construction plans and specifications,
including ability to request modifications to those plans. 2. typically owner or
developer. 3. has day-to-day operational control of those activities necessary
to ensure compliance with SWPPP.

Primary permittee requirements Right Ans - To obtain coverage under
CGP, they must submit NOI and prepare Comprehensive Stormwater Pollution
Prevention Plan (C-SWPPP)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zendaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart