100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CEPSCI – Questions & Solutions (Expert Verified) $9.99   Add to cart

Exam (elaborations)

CEPSCI – Questions & Solutions (Expert Verified)

 7 views  0 purchase
  • Course
  • CEPSCI
  • Institution
  • CEPSCI

CEPSCI – Questions & Solutions (Expert Verified)

Preview 2 out of 7  pages

  • October 29, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CEPSCI
  • CEPSCI
avatar-seller
Zendaya
CEPSCI – Questions & Solutions (Expert Verified)

Erosion Right Ans - The process by which the land surface is worn away by
the action of water wind ice and gravity.

Factors contributing to erosion Right Ans - Climate (rain frequency),
Season (storms in summer), vegetative cover, topography, soil characteristics.

Sedimentation Right Ans - Process by which eroded material is transported
and deposited

Sedimentation effects: Right Ans - reduces water clarity, fills up
ponds/reservoirs, pollutants attached to sediment impact water quality.

1972 Clean Water Act Right Ans - Administered by EPA, created the
National Pollutant Discharge Elimination System (NPDES)

NPDES in South Carolina Right Ans - SC is an NPDES delegated state.
NPDES regulations are administered by South Carolina Department of Health
and Environmental Control (DHEC).

epa DOES HAVE authority to exert jurisdiction in SC.

Department of Health and Environmental Control (DHEC) Right Ans - state
body that administers NPDES regulations. Construction General Permit is
administered by DHEC

Construction General Permit Right Ans - Affects both small and large
construction activities. Must be obtained for land disturbing activities of:
- 1 acre or greater
- Less than 1 acre but within a 1/2 mile of a water body in the coastal
counties)
- Less than 1 acre of total land area that is part of a larger common plan of
development if the development will end up disturbing more than 1 acre.

Operator categories: Right Ans - Primary permittee: developer, land owner,
site operator, public/private entity

Secondary Permittee: Residential builder, lot owner

, Contractors

lending institutions

Primary Permittee Right Ans - They have operational control over
Stormwater Pollution Prevention Plan (SWPPP), construction plans, and
specifications.

typically owner or developer

How to obtain coverage under Construction General Permit: Right Ans - 1.
Submit a Notice of Intent
2. Preparation of the Comprehensive Stormwater Pollution Prevention Plan
(C-SWPPP)

Secondary Permittee Right Ans - Conducts land disturbing activity limited
to an individual lot or group of lots. This is Ryan Homes

Contractors Right Ans - Employed by the primary or secondary permittees.
Before starting work, they must participate in pre-construction conference
and complete Pre-Construction Conference Certification Form

As well as a Contractor Certification Form

Lending Institution Right Ans - If a bank or government entity takes over a
site due to forclosure, they become responsible for site discharge

Stormwater Pollution Prevention Plans Right Ans - SWPPP is a site specific
document that:
- identifies sources of stormwater pollution
- describes control measure to reduce pollutants in site discharge
- identifies procedures for the operator to implement to comply with CGP

Comprehensive SWPPP vs. On-Site SWPPP Right Ans - Comprehensive:
includes calculations

On-Site: includes certification forms and records/logs.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zendaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

62555 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart