Sedimentation Right Ans - the process by which eroded material is
transported and deposited
"CGP" stand for Right Ans - Construction General Permit; one of the NPDES
permits administered by DHEC
When do you need a land disturbance permit Right Ans - > or = 1 acre
or
> or = 0.5acres with in 0.5 miles of a water body in a coastal county
What is a SWPPP Right Ans - Storm Water Pollution Prevention Plan
-Identifies potential sources of storm water pollution
-describes storm water control measures
-tells how CGP will be followed
What’s in a SWPPP Right Ans - -Copy of Permit
-Copy of "Notice of Intent" (NOI)
-Copy of approval letter from SCDHEC
-Construction plans
-Inspection report
-Copy o 404 permit and 401 certificates when applicable
In coastal zones the SWPPP must also include what 2 documents Right Ans
- -Coastal Zone Consistency Letter (CZC)
-Critical Area Permit (when applicable)
Who are the three parties in a CGP Right Ans - -Owner: person or business
who took out the CGP
-Operator: individual who has day-to-day operational control
-Secondary Operator: Primary contractor
How often are inspections done? Right Ans - Every 7 days once a month for
temporarily stabilized area
Does a rain gauge need to be present of site? Right Ans - Yes
, If an inspector see that maintenance or modifications need to be done for a
BMP...
1. what are the 2 levels of priority
2. what else must happen Right Ans - Priority 1: Remedy in 48 hours
(Sediment leaving site or failing BMP)
Priority 2: Remedy within 7 calendar days
Revisions to the SWPPP must be done within 7 calendar days after inspection
(by the resident constriction engineer)
When is a Grading and Stabilization log needed? Right Ans - When major
grading occurs or a graded area will be left (undisturbed) longer than 14 days
What are the 5 types of runoff control BMP's? Right Ans - 1. Pipe slope
drain
2. runoff diversion
3. stream crossing
4. construction dewatering
5. buffers and flow control
Buffer zones Right Ans - Required between disturbed area and surface
waters
Width and type are dependent on circumstances
5 types of common erosion prevention BMP's? Right Ans - 1. surface
roughening
2. temporary stabilization
3. mulching
4. erosion control blankets (ECB's)
5. Turf Reinforcement Mat (TRM)
4 types of long term BMP's Right Ans - 1. Final stabilization
2. riprap for channel stabilization
3. outlet protection
4. dust control
Surface roughening (3 things to know) Right Ans - 1. Dozer must run up
and down slope not across it. Bumps from dozer tracks will slow the water
down.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Zendaya. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $9.99. You're not tied to anything after your purchase.