Which three of the following are requirements for air terminals? - ANSWER-Air
terminals must have two paths to ground., Air terminals must be within 24 inches
of the edge of the building or end of a ridge., Air terminals must be 10 inches
above the object they are protecting.
Which two earth electrode systems are Army-approved for use in new and
renovated structures? - ANSWER-Ground loop, Ground rods
During an inspection you see a metal vent outside the zone of protection. The
vent's walls are 1/8 inch thick. Does it require an air terminal? - ANSWER-Yes,
because vents less than 3/16 inch thick require an air terminal.
What principle is used to determine placements for air terminals? - ANSWER-100-
foot radius rolling sphere
According to DA PAM 385-64, what is the minimum height for air terminals on
ammunition facilities with integral systems? - ANSWER-24 inches
During an inspection, you find an air terminal that is 30 inches high. At what point
does it need to be supported? - ANSWER-15 inches or higher
Drag and drop the name and description to the correct conductor. - ANSWER-
Cross-Run Conductor: Connects additional strike termination device - runs across
building
Roof Conductor: Runs along perimeter of flat roof or ridge of pitched roof
pg. 1
,Down Conductor: Required for all LPS; connects to the grounding system
Which of the following statements about conductors is true? - ANSWER-All LPS
require at least two down conductors.
For Class I structures, what is the minimum size of each strand of main conductor
copper wire? - ANSWER-17 AWG
When conducting an inspection, you see the following at the bottom of an LPS
mast. Do you report it? - ANSWER-Yes, because mast down conductors should be
180 degrees apart.
When conducting an inspection, you see what is shown in the image. Do you
report it? - ANSWER-no, because the guy wire can act as the second down
conductor.
How many down conductors are required for a building with a perimeter of 430
feet? - ANSWER-5
How many conductors are required for a building with a perimeter of 210 feet? -
ANSWER-2
Which three are requirements for conductors? - ANSWER-They interconnect all
air terminals., They may have only one rising path under 50 feet on a pitched roof.,
They may have only one rising path at less than 1/4 slope on a gently sloping roof.
What is the maximum length a cross-run conductor can run without connection to
the roof conductor? - ANSWER-150 feet
pg. 2
, If you were inspecting this mast, would you report a defect? - ANSWER-Yes, the
down conductors are supposed to be protected.
What is the preferred method of connecting conductors? - ANSWER-Exothermic
weld
Which two statements about bonding are true? - ANSWER-Bonding electrically
connects a metal object to an LPS., Bonding reduces the risk of sideflash.
Which bonding method is the most secure? - ANSWER-Welding
Which condition is most common for AE facilities? - ANSWER-Condition 2a
Which object is always required to be bonded? - ANSWER-A railroad track 4 feet
from an LPS conductor
Which condition applies to a 2-foot long grounded metal object on a 15-foot-tall
structure? - ANSWER-Condition 2a
Drag the variable to what it represents. - ANSWER-D - Bonding distance
h - Height of structure or proposed bond
n - Value representing the number of down conductors
Km - Flashover medium
A grounded metal object has been added to a structure 25 feet tall. What is the
bonding distance and is bonding required? - ANSWER-The bonding distance is 1
foot, and the object does not need to be bonded.
pg. 3
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller muriithikelvin098. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $24.99. You're not tied to anything after your purchase.