100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 3111 Exam 1 Questions and Answers 100% Solved | Graded A+ $10.99
Add to cart

Exam (elaborations)

CM 3111 Exam 1 Questions and Answers 100% Solved | Graded A+

 5 views  0 purchase
  • Course
  • CM 3111
  • Institution
  • CM 3111

CM 3111 Exam 1 Questions and Answers 100% Solved | Graded A+ contract documents - The ______ consist(s) of the invitation to bid, instructions to bidders, bid form, owner-contractor agreement, general conditions of the contract, supplementary general conditions, technical specifications, and t...

[Show more]

Preview 2 out of 12  pages

  • October 30, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CM 3111
  • CM 3111
avatar-seller
NinjaNerd
©NINJANERD 2024/2025. YEAR PUBLISHED 2024.
CM 3111 Exam 1 Questions and Answers

100% Solved | Graded A+


contract documents - ✔✔The ______ consist(s) of the invitation to bid,

instructions to bidders, bid form, owner-contractor agreement, general

conditions of the contract, supplementary general conditions, technical

specifications, and the working drawings and form(s) the legal basis for the

construction of the project.

detailed estimate - ✔✔The ______ includes determination of the quantities

and costs of everything required to complete the project. This includes the

materials, labor, equipment, insurance, bonds, and overhead, as well as an

estimate of profit.

cooperative bidding - ✔✔______ involves the contractor working with the

owner (or through the owner's architect-engineer) to arrive at a mutually

acceptable price for the construction of the project. It often involves

negotiations back and forth on materials used, sizes, finishes, and other

items which affect the price of the project.

, ©NINJANERD 2024/2025. YEAR PUBLISHED 2024.
square-foot - ✔✔______ estimates are prepared by multiplying the square

footage of a building by a cost per square foot and then adjusting the price

to compensate for differences in the building heights, length of the building

perimeter, and other building components. These estimates require less

information to prepare and are less accurate.

technical specifications - ✔✔The ______ are written instructions

concerning project requirements that describe the quality of materials to be

used and their performance.

working drawings - ✔✔The ______ are the actual plans from which the

project will be constructed. The contain the dimension and location of

building elements, the materials required, and delineate how they fit

together.

Builder's Risk Insurance, Life Insurance, Property Insurance - ✔✔What is a

type of insurance that a contractor should maintain?

retainage - ✔✔A percent of the payments from the owner to the contractor

that is withheld for the projection of the owner and suppliers.

separate contracts - ✔✔In this contracting scheme, the owner or their

agents provide the coordination between the contractors. Also, the owner

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller NinjaNerd. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

49051 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$10.99
  • (0)
Add to cart
Added