100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC CERTIFICATION FINAL EXAM LATEST ACTUAL EXAM 2025 QUESTIONS AND DETAILED CORRECT ANSWERS | A+ GRADE STUDYGUIDE $22.99
Add to cart

Exam (elaborations)

NERC CERTIFICATION FINAL EXAM LATEST ACTUAL EXAM 2025 QUESTIONS AND DETAILED CORRECT ANSWERS | A+ GRADE STUDYGUIDE

 0 purchase
  • Course
  • NERC CERTIFICATION
  • Institution
  • NERC CERTIFICATION

NERC CERTIFICATION FINAL EXAM LATEST ACTUAL EXAM 2025 QUESTIONS AND DETAILED CORRECT ANSWERS | A+ GRADE STUDYGUIDE

Preview 4 out of 63  pages

  • November 1, 2024
  • 63
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC CERTIFICATION
  • NERC CERTIFICATION
avatar-seller
TUTORWAC
NERC CERTIFICATION FINAL EXAM
LATEST ACTUAL EXAM 2025
QUESTIONS AND DETAILED CORRECT
ANSWERS | A+ GRADE STUDYGUIDE

After any event that results in an IROL violation, the
Transmission Operator shall return its transmission
system to within IROL as soon as possible, but not longer
than _____ minutes.

A) 15 mins

B) 30 mins

C) 45 mins

D) 10 mins Correct Answer B) 30 minutes

A __________ shall take all appropriate actions up to and
including shedding firm load, or directing the shedding of
firm load, in order to return the system from an IROL or
SOL? Correct Answer Transmission Operator

If there is a difference in derived operating limits the
Transmission Operators shall Correct Answer Operate to
the most limiting parameter

Each Transmission Operator shall acquire
______________ within its area to protect the voltage

,levels under normal and contingency conditions. Correct
Answer sufficient reactive resources

If a generator AVR (Automatic Voltage Regulator) is
removed from service, what must the GOP do? Correct
Answer Use alternative method to control voltage and
reactive output

How soon after removing an AVR from service must a
GOP notify the TOP? Correct Answer As soon as
practical, but less than 30 mins

The Transmission Operator shall direct corrective action,
including ________ necessary to prevent voltage collapse
when reactive resources are insufficient. Correct Answer
Load reduction (only result to this when resources are
insufficient)

Who shall know the status of all transmission reactive
power resources, including the status of voltage regulators
and power system stabilizers?

A) Balancing Authorities

B) Generator Operator

C) Reliability Coordinator

D) Transmission Operator Correct Answer D)
Transmission Operator

,The Reliability Coordinator shall have _______ to act and
to direct actions to be taken by Transmission Operators,
Balancing Authorities, Generator Operators, Transmission
Service Providers, Load-Serving Entities, and Purchasing-
Selling Entities within its Reliability Coordinator Area to
preserve the integrity and reliability of the Bulk Electric
System. Correct Answer Clear decision making and
authority.

Each Reliability Coordinator shall know the current status
of all critical facilities whose failure, degradation or
disconnection could result in an Correct Answer SOL
(System operating limit)
&
IROL (Interconnection reliability operating limit) violation

Each Reliability Coordinator shall have ______________
communications capabilities with its Transmission
Operators and Balancing Authorities, and with neighboring
Reliability Coordinators. Correct Answer Interpersonal

If a Reliability Coordinator notices an operational concern
in another Reliability Coordinators region it should do
which of the following? Correct Answer Notify the other
Reliability Coordinator

If the results of these studies indicate potential SOL or
IROL violations, the Reliability Coordinator shall issue the
appropriate alerts via the Correct Answer RCIS (Reliability
Coordinator Information System)

, **RC's use this to share operating information in real time.

In instances where there is a difference in derived limits,
the Reliability Coordinator and its Transmission Operators,
Balancing Authorities, Generator Operators, Transmission
Service Providers, Load-Serving Entities, and Purchasing-
Selling Entities shall always operate the Bulk Electric
System to the Correct Answer Most limiting parameter

Regardless of the process it uses, the Reliability
Coordinator must direct its Balancing Authorities and
Transmission Operators to return the transmission system
to within its Interconnection Reliability Operating Limits as
soon as possible, but no longer than Correct Answer 30
mins

Each Reliability Coordinator shall, in conjunction with its
Transmission Operators and Balancing Authorities shall
do which of the following to return transmission loading to
within acceptable SOLs or IROLs? Correct Answer
operate at limiting parameter

Each Reliability Coordinator shall monitor _________ and
its Balancing Authorities' performance and direct any
necessary rebalancing to return to CPS and DCS
compliance. Correct Answer System frequency

Which of the following is the NERC Criteria for having to
report a BES emergency that resulted in manual load
shedding? Correct Answer 100 MW

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORWAC. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $22.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67479 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$22.99
  • (0)
Add to cart
Added