100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Lean Bronze Study Final Exam |Questions with 100% Correct Answers | Verified $13.49   Add to cart

Exam (elaborations)

Lean Bronze Study Final Exam |Questions with 100% Correct Answers | Verified

 0 view  0 purchase
  • Course
  • Lean Bronze Certification
  • Institution
  • Lean Bronze Certification

Lean Bronze Study Final Exam |Questions with 100% Correct Answers | Verified

Preview 4 out of 47  pages

  • November 8, 2024
  • 47
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Lean Bronze Certification
  • Lean Bronze Certification
avatar-seller
Examcheatcode
Lean Bronze Study Final Exam |Questions with
100% Correct Answers | Verified
Which of the following is not a pillar of gemba kaizen in the common-sence, low-cost approach
to improvement according to Masaaki Imai?
5S (Housekeeping)
Muda Elimination
Standardization

Correct Answer Quality function deployment - ✔️✔️Quality function deployment


In order to form a view in the minds of value stream managers of what perfection would be,
which of the following is NOT a principle he/she needs to apply?
Value specification
Correct Answer Push production
Flow

Value stream identification - ✔️✔️Push production

Flow


Which is not a sign of Muri?


Operator sweating profusely
Correct Answer Operating waiting for work
Operator analyzing squealing sound coming from machine

Operator struggling to understand job requirements - ✔️✔️Operating waiting for work


Which item is not thought of as a key feature of standards?
Used to measure performance
Correct Answer Limits free thinking

,Describes the one best way

Provides basis for improvement - ✔️✔️Limits free thinking


Why do we seek perfection on our lean continuous improvement journey?
Our customers demand perfection and it is our responsibility to give it to them
Competing companies are seeking perfection
The only way to 100% quality is through perfection
Correct Answer Seeking perfection causes us to look for opportunities not seen if only focused
on minor improvement - ✔️✔️Seeking perfection causes us to look for opportunities not seen if
only focused on minor improvement


An activity which does not add value is called:
Heijunka
Dojo
Correct Answer Muda

Gemba - ✔️✔️Muda


Which of the following is NOT one of the 4Ms at Toyota to ensure stability?
Man/Woman
Machine
Material

Correct Answer Measurement - ✔️✔️Measurement


Which of the following is used to control production where continuous flow does not extend
upstream?
Shadow board
Correct Answer Supermarket
Balanced scorecard

,Andon board - ✔️✔️Supermarket


To achieve stability, one must occasionally implement:
Correct Answer Non-lean actions such as increasing buffers
Total productive maintenance
Standards

Visual management systems - ✔️✔️Non-lean actions such as increasing buffers


The principle of Jidoka does not include which of the following items?
Correct Answer Final inspections
Rapid defect identification
No answer text provided.

No answer text provided. - ✔️✔️Final inspections


Who was considered the first to realize the potential of flow?
Fred Winslow Taylor
Correct Answer Henry Ford
Taiichi Ohno

Shigeo Shingo - ✔️✔️Henry Ford


Standards are meant to:
Be constant
Be the best method (s)
Correct Answer Continually change

Communicate in-standard conditions - ✔️✔️Continually change


Which of the following would have the lowest defect rate?

, General errors of commission (eg misread label and selected wrong switch)
Simulated military emergency
Correct Answer Two-man team (one do and one check, then reverse roles)

General error of omission (no control room display) - ✔️✔️Two-man team (one do and one
check, then reverse roles)


The Japanese word "ji-do-ka" is comprised of three Chinese characters, where "do" refers to:
stop work
Correct Answer motion
stop of the line

something is wrong - ✔️✔️Motion


Which of the following is NOT an activity of standardization?
Kanban
5S
Correct Answer Heijunka

Hoshin Planning - ✔️✔️Heijunka


Process A has 35 minutes of processing time and 63 minutes of retention time. What is the lead
time?
63
Correct Answer 98
28

35 - ✔️✔️98


What is the overall equipment effectiveness, given availability= 0.95, performance efficiency=
0.90 and quality rate 0.92?
Correct Answer 0.7866

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Examcheatcode. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78252 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart