csx safety Questions and Answers 100% Solved correctly
5 views 0 purchase
Course
Csx safety
Institution
Csx Safety
What should be done if an employee feels the track protection provided at the job
briefing is not in accordance with the On-Track Workers Rules? - ️️Communicate
his concerns to the IC, attempt to resolve at the job briefing and remain clear of the
track until concerns are resolved.
is a wor...
csx safety
What should be done if an employee feels the track protection provided at the job
briefing is not in accordance with the On-Track Workers Rules? - ✔️✔️Communicate
his concerns to the IC, attempt to resolve at the job briefing and remain clear of the
track until concerns are resolved.
is a working radio required if you are going to be a watchman /lookout - ✔️✔️yes and
the radio needs to be accessible to the group
When is a track considered to be adjacent? - ✔️✔️if the track is within 25 feet of the
center of the one you are working
Which of the procedures listed below, is an acceptable way of making a Non-Controlled
Track inaccessible? - ✔️✔️Properly secured trailing point switch.
When is a Statement of On-Track Safety (SOTS Form) required? - ✔️✔️
What type of protection is needed to replace a joint bar in a yard track (non-controlled
territory)? - ✔️✔️The track will need to be made inaccessible per rule 706
What is the minimum distance between machines that are working? - ✔️✔️25 feet,
unless otherwise established in the job briefing.
If you are operating a machine with a defect, that does not make it unsafe, how long can
you operate it? - ✔️✔️7 days
What is the minimum distance between machines that are tramming? (Excluding Ballast
Regulator) - ✔️✔️
What is the one thing that you can do and be in the foul of the track without some form
of protection? - ✔️✔️walk from one side to the other after looking in both directions
Besides safety equipment, what other piece of equipment is required for all Lone
Workers regardle which type of on-track protection they are using? - ✔️✔️working
radio
who must you receive permission from before engineering employees set up protection
and work in an activated remote control zone - ✔️✔️yard master
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $7.99. You're not tied to anything after your purchase.