100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Lean Bronze Certification Study Guide Solutions Updated 2024 $12.49   Add to cart

Exam (elaborations)

Lean Bronze Certification Study Guide Solutions Updated 2024

 0 view  0 purchase
  • Course
  • Prep Tests
  • Institution
  • Prep Tests

Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED Copyright ©Stuvia International BV Page 2/8 Value stream lead time is comprised of cycle time and: - ANSWER-retention time PDCA refers to: - ANSWER-Plan, do, check, act Long set ups Most likely will: - ANSWER-decrease flexibi...

[Show more]

Preview 2 out of 8  pages

  • November 11, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Prep Tests
  • Prep Tests
avatar-seller
OliviaWest
Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED




Lean Bronze Certification Study Guide

Solutions Updated 2024


Goals in an organization cannot be achieved without adequate time allowed for - ANSWER✔✔-training


A learning organization - ANSWER✔✔-operates from common goals developed by the organizations

stakeholders


Management must do more than just go to where work is done to lead continuous improvement. By this

we mean they must - ANSWER✔✔-Be able to simply articulate and measure the opportunities for

improvement


The two pillars of the Toyota Production System are: - ANSWER✔✔-automation and just - in - time


Which lean concept below refers to the best combination of man, machine, materials and methods? -

ANSWER✔✔-Standardized work


Making everything simple, clear and easy to understand at a glance in a work area is an example of: -

ANSWER✔✔-visual management


On a value stream map with production lead time of 6 days and retention time of 5 days: - ANSWER✔✔-

Processing time is the smallest component of value stream lead-time


The layout of machines into a tight sequence, typically in a U-shape is called a - ANSWER✔✔-work cell


Which of the following is considered value added work? - ANSWER✔✔-changing the shape of a part or

assembly


Copyright ©Stuvia International BV 2010-2024 Page 1/8

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


Value stream lead time is comprised of cycle time and: - ANSWER✔✔-retention time


PDCA refers to: - ANSWER✔✔-Plan, do, check, act


Long set ups Most likely will: - ANSWER✔✔-decrease flexibility


Pull systems are a good way to - ANSWER✔✔-connect and synchronized pieces. of the value stream


A goal of a lean production is to be good enough to: - ANSWER✔✔-produce every part, everyday


An operator balance chart is associated with: - ANSWER✔✔-Standardized work


Effective Suggestions programs: - ANSWER✔✔-Encourage idea generation and reward team member

initiative


Total Quality Control (TQC) is an integrated effort aimed to: - ANSWER✔✔-driving continuous

improvements at all levels


The BEST way to describe a "root cause" solution is: - ANSWER✔✔-A solution that will prevent problem

from recurring


Which of the following is the best description of the foundation of a good lean system? - ANSWER✔✔-

Stability and standardization


Problem solving in a lean company has the following common themes; - ANSWER✔✔-collecting,

analyzing, and verifying data


When supplier lead - times are long: - ANSWER✔✔-Is it still possible to set-up pull systems


Which of the following is the BEST definition of perfection? - ANSWER✔✔-the complete elimination of

waste so that all activities along a value stream create value


Copyright ©Stuvia International BV 2010-2024 Page 2/8

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller OliviaWest. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78075 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart