CALIFORNIA ICC TECHNICIAN: QUESTIONS AND
ACTUAL ANSWERS (100% ACCURATE)
1. I do a ____ after replacing a spout to a Healy 900 nozzle Right Ans - shut
off test
2. In a balance hose the gasoline flows in Right Ans - Inner hose
3. After the installation of the vapor piping and before back filling, PEI 300
suggests some methods to document piping layout, except? Right Ans -
Drawing with a pen, pipe layout on the cover of the tank manual.
4. During VO-1000 you don't Right Ans - Work without eye protection
5. An Overfill Alarm device needs to be located Right Ans - Where it can be
heard or seen by the delivery location.
6. When in a GDF you can avoid the installation of UDC? Right Ans - No
exceptions of any GDF.
7. What is considered an Underground Storage Tank? Right Ans - Tank and
pipping only
8. Gasoline vapors are 3/4 times _____ than air Right Ans - Heavier
9. Compounds with a high vapor pressure such as gasoline will evaporate
readily and will typically Right Ans - Have a low Flashpoint.
10. The ____ is the valve that controls pressure and vacuum on the tank.
Right Ans - P/V Valve
11. The vapor piping must be all, but not Right Ans - Compatible with
underground environment.
12. The Shear Valve is installed ____ Right Ans - At the base of the dispenser.
13. What is the max length of a Healy Hose Phase 2? Right Ans - 20 Feet.
, 14 A ___ is a component of the hanging hardware that separates when it's
applied a force? Right Ans - Breakaway.
15. UL listed means all except : Right Ans - Worldwide Approved.
16. After a drive off, a technician should not Right Ans - Ask attendant to fill
out a drive off accident report.
17. The executive order 201-A says that the reconnection of the breakaway
needs to be Right Ans - Logged in the maintenance GDF.
18. What is not a secondary containment testing method? Right Ans -
Statistical Inventory Reconciliation.
19. The air clean seperator must be located in the GDF Right Ans - No more
than 100 ft from the vent riser.
20. The PEI-500 recommends that to avoid being shocked by electricity or
soaked with gasoline that? Right Ans - You must disconnect power to all
electric devices.
21. Which of these refer to a vapor recovery stage 1? Right Ans - Delivery
of gasoline and UST.
22. Which is not part of the hanging hardware? Right Ans - Shear Valve
23. What is not apart of a stage 2 vapor recovery? Right Ans - Monitoring
equipment
24. To install a Healy Z083B Vapor Vac Kit you need the following tools except
Right Ans - Stretching copper tool
25. After July 1 2004 continuous monitoring on secondary containment is
required on? Right Ans - Tanks, sumps, UDC where single wall pipe is
present.
26. The 1/8 inch of foot slope in vapor pipping may not be applied if? Right
Ans - Should always apply to avoid blocks.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller LeCrae. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.99. You're not tied to anything after your purchase.