2024 newest|FDOT Earthwork Level 1|2024-2025
UPDATE|COMPREHENSIVE QUESTIONS AND
VERIFIED SOLUTIONS/CORRECT
ANSWERS|GET 100% ACCURATE!!
Practice questions for this set
Learn 1 /7 Study with Learn
detailing verification pass or fails
Give this one a try later!
In the gauge diary (for standard
1 counts) when it is not used what 2 Determine the dry density by
do you put down?
The lot index and special Record the dry density county at
4
conditions is for an accuracy of
Don't know?
Terms in this set (93)
https://quizlet.com/970336951/2024-newestfdot-earthwork-level-12024-2025-updatecomprehensive-questions-and-verified-solutionscorrect-answ… 1/8
, 11/12/24, 6:39 PM 2024 newest|FDOT Earthwork Level 1|2024-2025 UPDATE|COMPREHENSIVE QUESTIONS AND VERIFIED SOLUTIONS/…
Nuclear Testing
Basics covered in Level 1 Speedy Moisture
Report Forms
Earthwork has to do with Earthwork is the excavation and placement of soils
the roadway in what and materials supporting the proposed roadway.
way?
In Earthwork what is a 6" of compacted depth at full width
lift?
In Earthwork what is a A lot is 1 lift at 500 ft or within compacted area.
Lot? Isolated compaction operations are separate lots.
Sampling at the roadway Done for base, sub grade, and embankment.
is done for
Sampling is determined generated with random numbers usually by a
how Verification Inspector
What is important about Minimum of three representative sample combined.
sampling at the roadway
What is LIMS? Laboratory Info Management System
The proctor theory is by inputting energy to expel air and water in the soil
when compaction is voids
achieved how
An increase in unit weight, decrease in
Compaction causes
compressibility and permeability.
The proctor is In a laboratory and establishes a density standard to
determined where and be used on the roadway
creates what
Material is gathered from the road and prepared
Lab proctors are created
with different amounts of water then placed in
how
molds and hammered
What is a modified It is used in base, sub grade, MSE wall back fill
proctor used in materials
Modified proctors are With a 10lb hammer(rammer) on a 18" drop with 56
created how blows per layers with 5 layers in total.
https://quizlet.com/970336951/2024-newestfdot-earthwork-level-12024-2025-updatecomprehensive-questions-and-verified-solutionscorrect-answ… 2/8