NCARB are CDS - AHPP notes Questions With Complete Solutions One of the key differentiators of the various delivery methods The decision as to when the contractor agrees to a figure and the resulting responsibilities of the contractor Project delivery methods Design bid build, construction ma...

[Show more]

Preview 4 out of 65  pages

  • November 13, 2024
  • 65
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCARB...
  • NCARB...
avatar-seller
UpperClass
NCARB are CDS - AHPP notes Questions
With Complete Solutions

One of the key differentiators of the various delivery methods The decision as to when the

contractor agrees to a figure and the resulting responsibilities of the contractor




Project delivery methods Design bid build, construction management, design build




Design bid build Involves linear design sequence, set of construction documents which

contractors submit fixed-price bids. Lowest bidding contractor is usually selected to build the

project.




Negotiated team Negotiated select team involves early selected contractor and or

subcontractors , contract terms such as overhead and profit multipliers determined prior to

completion of the construction documents.




Portions of the building that may be particularly difficult to fabricate or construct may be

accelerated under the negotiated select team approach The selected contractor may be

available for consultation regarding construction issues during design.

, NCARB are CDS - AHPP notes Questions
With Complete Solutions
Cost-plus fee Contractor selected at the completion of construction documents, but the

scope of construction is unpredictable.




Under a cost plus fixed fee contract, the contractor is paid actual labor and material costs for

construction plus a fee for coordination of trades Incentives may be added to the fee if the

project finishes early or under the original budget.




Owners have increasingly demanded detailed construction and technical advice earlier in the

design process The construction community has accommodated this need by creating the

field of construction management




Three construction management roles Advisor, agent, constructor




Construction management advisor Acts as a constructibility and cost management

consultant during the design and construction process, does not construct a building.




Construction manager agent Provides early consulting and may act on behalf of the owner

in assembling and coordinating the construction trades prior to and during construction.

, NCARB are CDS - AHPP notes Questions
With Complete Solutions
Construction management agents typically provide their services for a fixed fee and assume no

risk for the actual construction costs, pass on savings and overruns directly to the owner.

CM agent is authorized to enter into contracts on behalf of the owner, advisor is not.




Construction management constructor Technical and cost advisor role of the contractor

during the project design phase transitions at a point to the role of contractor for the project




Construction management constructor frequently use guaranteed maximum price This is a

commitment by the construction manager to build the project for a specified price developed

from design documents, typically at design development.




Inherently difficult role stems from construction manager acting as contractor and estimator

Cost decisions made early in design directly affect the construction managers cost and

profitability later in construction.




Design build delivery method provides the owner with a single point responsibility for both

design and construction Emerged from owners dissatisfaction with tensions and conflicts

between architects and contractors

, NCARB are CDS - AHPP notes Questions
With Complete Solutions
One problem with design build is the mechanism by which the owner establishes and enforces

the performance and quality parameters of the project This role was typically assumed by

the architect as an agent for the owner separate from the contractor.




Bridge design build is a variation of design build which addresses the owner representation

problem Bridge design build employees : a design architect reestablishes the design

concept and a production architect who determines technical criteria and generates construction

documents.




In bridging, the owner eventually hires to Architects, one of which is part of a design build team

The first Architect prepares a preliminary design for a building and performance

specifications, detailed criteria to which the ultimate design must conform




The completed concept and criteria package, based on design development drawings and

specifications Is then tendered to design build teams that offer both technical architecture

and construction capabilities.




Guaranteed maximum price approaches to construction cost Establishment of a

guaranteed maximum price suggests a commitment by the owner and construction manager

contractor to a cost based on a partially complete set of design documents.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller UpperClass. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $24.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76799 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$24.99
  • (0)
  Add to cart