NCARB ARE CDS 5 Questions With Complete Solutions Architectural phase that is the most difficult to estimate time required for Schematic design is the phase that is the most difficult to estimate, since it has the greatest amount of variability. Factors affecting the time required for schem...

[Show more]

Preview 3 out of 21  pages

  • November 13, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCARB...
  • NCARB...
avatar-seller
UpperClass
NCARB ARE CDS 5 Questions With
Complete Solutions

Architectural phase that is the most difficult to estimate time required for Schematic

design is the phase that is the most difficult to estimate, since it has the greatest amount of

variability.




Factors affecting the time required for schematic design Size and complexity of the

project, quality and completeness of the program, decision-making ability of the client, nature of

the design team.




What is the main factor determining scheduling and staffing requirements for a project

The complexity of a project, rather than its size, determines scheduling and staffing

requirements.




Time required for design development From 2 to 4 months




Time required for construction documents From 3 to 7 months




Time required for bidding or negotiation Typically requires 3 to 6 weeks, regardless of the

size of the project.

, NCARB ARE CDS 5 Questions With
Complete Solutions

Schedule contingency factor If the total time required is eight months, additional

allowance of at least 2 to 4 weeks should be budgeted.




Early cooperation with a builder Often results in a GMP, guaranteed maximum price,

upon completion of contract documents.




Effect of working closely with a builder on the Architects production schedule Overall

project time is generally shortened since trying time overlaps actual construction. Schematic and

design development will take more time, construction documents will take the same time.




Effect of working with a contractor on overall design hours spent The Architects staff

hours maybe greater because of the time spent coordinating with the contractor and possible

redesigning.




Effects of an extended design schedule Increased cost due to inflation.




Ways to reduce design time Architectural team works overtime, hire more people, reduce

the man-hours spent on the project.

, NCARB ARE CDS 5 Questions With
Complete Solutions

Working the design team overtime Saves time, but costly and inefficient.




Hiring more people to reduce design time Costly and inefficient, new staff will not be

familiar with office procedures or the particular project, their competence is unknown.




Producing the man-hours spent on a project Results in a lower quality job.




Activities in the critical path method Activities are represented by errors on the CPM

chart




Events or nodes in CPM The definite start and finish of each event, represented by circles.

Event is defined as the moment with a preceding activity has been completed in the following

activity may begin.




Milestone events Important points in the construction process, such as the roofing of a

new building

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller UpperClass. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.49
  • (0)
  Add to cart