100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
AAAE CM, MODULE 1 EXAM 180 QUESTIONS AND CORRECT{VERIFIED} ANSWERS NEWEST //ALREADY GRADED A+ What is required for a project to be eligible for AIP funding? $26.49   Add to cart

Exam (elaborations)

AAAE CM, MODULE 1 EXAM 180 QUESTIONS AND CORRECT{VERIFIED} ANSWERS NEWEST //ALREADY GRADED A+ What is required for a project to be eligible for AIP funding?

 1 view  0 purchase
  • Course
  • AAAE CM, MODULE 1
  • Institution
  • AAAE CM, MODULE 1

AAAE CM, MODULE 1 EXAM 180 QUESTIONS AND CORRECT{VERIFIED} ANSWERS NEWEST //ALREADY GRADED A+ What is required for a project to be eligible for AIP funding? AAAE CM, MODULE 1 EXAM 180 QUESTIONS AND CORRECT{VERIFIED} ANSWERS NEWEST //ALREADY GRADED A+ What is required for a project to be e...

[Show more]

Preview 3 out of 25  pages

  • November 14, 2024
  • 25
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • AAAE CM, MODULE 1
  • AAAE CM, MODULE 1
avatar-seller
Settings
AAAE CM, MODULE 1 EXAM 180 QUESTIONS AND
CORRECT{VERIFIED} ANSWERS NEWEST 2024-2025//ALREADY
GRADED A+
What is required for a project to be eligible for AIP funding? - ANSWER-- aligned with plans of
planning agencies

- money must be available

- project completed without undue delay

- airport is in the NPIAS

- Involves more than $25,000 in funds

- ALP must be current



What's a PFC and how do they work? - ANSWER-A user fee assessed by the airport operator for a
passenger departing or transferring through their airport. FAA has to approve of collection. If you collect
PFCs you reduce your AIP entitlements by 75%. And capital projects completed with PFCs also have to be
approved by FAA.



What are General Obligation Bonds? - ANSWER-Usually ranked with the best or highest rating. They
are issued by gov. Cities or states and secured by voter approval



Why are Revenue Bonds - ANSWER-Issued by gov or airport operator; secured by revenues of the
airport or backing of airline; lower front payments and longer issue period



Special Facility Bonds - ANSWER-They are backed by revenue of funded facility and are tax exempt;
issued by airports

Hybrid Bonds - ANSWER-They are backed with PFCs or CFC;



Industrial Development Bonds - ANSWER-Are issued same as a revenue bond but for private entity l;
they are backed by the airport and provide a facility to a tenant in order to expand development at the
airport.

,What is a CFC? - ANSWER-CFCs are charged to rental car operators at an airport with the monies
commonly going towards landside capital improvement or maintenance projects,



What is the purpose of the ALP? - ANSWER-1. FAA- approved plan necessary for the airport to
receive
AIP funding and to continue to receive PFC funding

2. It's a blueprint for airport development

3. It's a public document.

4. Enables the FAA and airport sponsor to plan for improvements

5. And it's a working tool for airport staff including operations and maintenance personnel



Most important elements of the ALP? - ANSWER--ALP cover Sheet: Signature blocks, area maps

- ALP sheet: existing and future planned facilities

- Data Sheet: wind rose, runway length etc.

- Facilities Layout Plan/ Terminal Area Plan: terminal buildings, ownership and leaseholds

- Airport Airspace Drawlings: Part 77 surfaces (imaginary surfaces)

- Inner Portion of the Approach Surface Drawling: focuses on the instructions on the approach path

Land Use Drawling: shows local zoning and land use on and around the airport.

- Airport Property Map, Exhibit A: shows dates , parcels and how land was acquired



What does the ALP NOT do? - ANSWER-It doesn't release and federal obligations attached to land or
properties and it doesn't constitute FAA approval to use land for non-aeronautical proposes. (Those are
different approval processes.)



When should the ALP be updated? - ANSWER-Every 2-7 years

What's the criteria for the FAA to approve an ALP update? - ANSWER-Safe: meets design standards
or modified design standards and provides for the safe operation of aircraft

Useful: means the airport is making the best use of airport land while minimizing the impact of off
airport structures

, Efficient: means that planned capacity is sufficient for forecast demand



What document, that provides information to pilots, must be updated annually? - ANSWER-The
Airport Data Record (FAA 5010 Form)



What is the NPIAS? - ANSWER-The National Plan OG Integrated Airport Systems

- identifies more than 3,000 airports

- all commercial service

- all GA relievers

- all National Guard based on civilization airports

- any airport with a US Mail contract



Published every two years identifies locations for eligible for federal funding under the AIP over the next
5 years



What are the FAA principles related to airports? - ANSWER-1. Safe and efficient

2. Affordable (rely on user fees)

3. Flexible & expandable

4. Permanent

5. Maintain balance with ATC and community

6. Support National Objectives

7. Extensive (no more than 20 miles to next airport)



Why are state or regional plans for airports conducted? - ANSWER-Metropolitan Airport System
Plans are created to access a development plan for intermodal transportation in a city, or state

Steps in a Master Plan process? - ANSWER-1. Design and scope and consultant selection (pre-

planning) 2. Public involvement (ongoing)

3. Environmental Considerations (ongoing)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Settings. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $26.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$26.49
  • (0)
  Add to cart