CompTIA Project+ Practice Assessment Exam Questions and Answers.
0 view 0 purchase
Course
CompTIA Project+
Institution
CompTIA Project+
CompTIAProject+PracticeAssessmentExam
QuestionsandAnswers.
A project manager reviews the notes from a previous project and discovers issues with
community interactions. The project manager learns that the project improperly disposed
of waste. What factors did the past project fail to impose? (S...
CompTIA Project+ Practice Assessment Exam
Questions and Answers.
A project manager reviews the notes from a previous project and discovers issues with
community interactions. The project manager learns that the project improperly disposed
of waste. What factors did the past project fail to impose? (Select all that apply.)
Environmental
Social
Governance
Current state - Environmental
Social
Governance
An organization instructs a project manager to conduct a cost performance exercise on a
project. The project manager calculates the cost variance of the project by referencing
what other input? (Select all that apply.)
Planned value
Contingency reserve
Earned value
Actual cost - Earned value
Earned value (EV) is the actual schedule and is a point in time value. To calculate a cost
variance, actual cost is subtracted from earned value.
Actual cost
Actual cost (AC) is the actual cost and is a point in time value. The cost variance is earned
value less the actual cost.
A project manager assigns a team member to create a list of measurable quality targets.
Which quality-related function does the team member perform?
Quality assurance
Quality control
Quality standards
,Quality objectives - Quality objectives
Quality objectives are within a quality assurance plan by creating a list of measurable
quality targets. The project will have multiple quality targets. Examples of targets include
on-time delivery and the number of defects.
When practicing a waterfall project methodology, in which phase is a project team
member responsible for valid quality specifications?
Testing
Design
Requirements
Maintenance - Testing
In the waterfall testing phase, project team members verify that any work completed
meets the requirements and quality specifications.
A company posts an internal memo inviting team members to join a project. The post
states that participants will receive an additional 2% pay for any eligible project hours in
addition to the standard company hourly rate. The project manager calculates the pay
with which value while building a resource worksheet?
Resource cost rate
Unit of measure
Cost aggregation
Reserves - Unit of measure
A resource cost rate matches with some unit of measure (UOM). The UOM will vary by
resource type. Hourly is an example of a UOM.
A project manager looks at a resource management plan and realizes that the project
manager can do some phases of the resource lifecycle in parallel. Which phases does the
project manager review and take action on simultaneously? (Select all that apply.)
, The improvement and maintenance phases run simultaneously for a single product.
Between acquiring and retiring a resource, the project manager cares for and improves it.
A project manager prepares a new project's work breakdown structure (WBS). The project
manager creates a branch for certain tasks and then ends the branch with a final outcome.
When drafting the WBS, what terminology does the project manager assign to the
outcome? (Select all that apply.)
Element
Level
Work package
Leg - Element
Work package
Elements are the deliverables in a work breakdown structure (WBS). It is each box in a
chart and each row in a table. The WBS element is short, at just two or three words.
The work package element is the lowest in each branch or leg; an element without a child
element is a work package. Known as a "terminal element," a work package estimates
costs, resources, and timing.
A seasoned project manager prefers to manage projects in a linear and sequential
fashion. Which framework does the project manager use?
Waterfall
Agile
Kanban
Scrum - Waterfall
The waterfall is a linear, sequential project management framework. All work gets
completed in one phase before another phase starts. Work only flows one way in the
waterfall.
A seasoned project manager requires all team members to be available for a weekly
meeting. Participants are required to be present as the meeting occurs in real-time.
Following the meeting, a staff member will use a designated communication channel to
distribute meeting minutes. What communication methods are used in this scenario?
(Select all that apply.)
Synchronous
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Lectjoe. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $17.99. You're not tied to anything after your purchase.