100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
APIC'S CPIM Part 1 Post Test 50 Correct Questions and Answers. $17.99   Add to cart

Exam (elaborations)

APIC'S CPIM Part 1 Post Test 50 Correct Questions and Answers.

 4 views  0 purchase
  • Course
  • APIC\\\'S CPIM
  • Institution
  • APIC\\\'S CPIM

APIC'S CPIM Part 1PostTest 50 CorrectQuestions and Answers. In addition to customer orders, the master production schedule (MPS) might handle which of the following types of demand? Bill-of-material items Interplant orders Dependent demand Parts list items - Correct Answer Interplant orders:...

[Show more]

Preview 2 out of 12  pages

  • November 16, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • APIC'S CPIM
  • APIC'S CPIM
avatar-seller
Lectjoe
APIC'S CPIM Part 1 Post Test 50 Correct Questions and
Answers.
In addition to customer orders, the master production schedule (MPS) might handle which
of the following types of demand?
Bill-of-material items
Interplant orders
Dependent demand
Parts list items - Correct Answer Interplant orders: Interplant demand is usually handled
by the master production scheduling system in a manner similar to customer orders.

A shipment of remote control components is delivered to a factory and immediately taken
to a workstation ready to begin assembly. What is the name of this inventory management
technique?
Lot-for-lot
Lot control
Efficient
Wall-to-wall inventory - Correct Answer Wall-to-wall inventory: In wall-to-wall inventory
management, materials enter a plant and are processed right away, as opposed to being
logged in an inventory store until a later date.

Given the following, what is the work center backlog?
Average input: 100 units/week
Average output: 100 units/week
Current work in process: 160 units
.63 weeks
1 week
1.6 weeks
2.6 weeks - Correct Answer 1.6 weeks: To calculate the load that is backlog at a work
center, divide the current number of units (or hours) currently at the work center by the
average output, or 160 units/100 units of output per week = 1.6 weeks of load.

Which correctly identifies the following examples of costs as internal failure (I), external
failure (E), appraisal costs (A), and prevention costs (P)?
Operator training= I; product recalls and loss of customers = E; scrap and machine
maintenance= A; in-line inspection = P
Machine maintenance and in-line inspections = I; scrap and loss of customers = E;
product recalls = A; operator training = P
Scrap = I; product recalls and loss of customers = E; in-line inspections = A; machine
maintenance and operator training = P
Product recalls = I; scrap and in-line inspections = E; loss of customers = - Correct Answer
Scrap = I; product recalls and loss of customers = E; in-line inspections = A; machine
maintenance and operator training = P: Scrap is an internal failure cost because it occurs
without the customer seeing it. Product recalls and loss of customers are external failure
costs because the first is directly experienced by customers and the second is a direct

, customer reaction to poor quality. In-line inspections are an appraisal cost because this is
an example of a quality control activity. Machine maintenance and operator training are
examples of prevention costs because these are investments designed to reduce the
chances of quality problems occurring in the first place.

Companies typically make final purchasing decisions based on which of the following
supplier characteristics?
Supplier fixed cost
Product advertising
Delivery reliability
Free-on-board shipping - Correct Answer Delivery reliability: Besides perfect quality, a
key final purchasing decision point is delivery reliability. Ensuring that purchase deliveries
arrive on time is an essential feature of supplier partnerships.

What type of demand inventory ordering model includes fixed reorder cycles, fixed
reorder quantities, optional replenishment, and hybrid models?
Material requirements planning
Independent
Drum-buffer-rope
Kanban - Correct Answer Independent: independent demand inventory ordering models
include fixed reorder cycles, fixed reorder quantities, optional replenishment, and hybrid
models, among others. Dependent demand inventory ordering models include material
requirements planning, kanban, and drum-buffer-rope.

What is the primary difference between enterprise resources planning (ERP) and
manufacturing resource planning (MRP II)?
ERP is computer-based, but MRP II is not.
ERP integrates additional business functions, including human resources, research and
development, logistics, and others.
ERP includes manufacturing information only.
ERP provides a balance between production, marketing, and information technology. -
Correct Answer ERP integrates additional business functions, including human
resources, research and development, logistics, and others.: ERP provides more than just
manufacturing information; it integrates business functions like human resources,
research and development, and logistics. MRP II and ERP are both computer-based, and
both provide a balance between production, marketing, and information technology.

The day 56 log for a work center shows planned input of 14 hours, actual input of 16 hours,
and a cumulative input variance of -2 hours. For the same day the planned output was 15
hours, the actual output was 14 hours and the cumulative output variance was -5 hours.
The day 55 log showed the planned backlog was 7 hours and the actual backlog was 6
hours. What is the planned backlog for day 56?
0 hours
6 hours
-7 hours

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Lectjoe. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart