MED GAS PRACTICE TESTS QUESTIONS AND
ANSWERS
An existing system that is not in strict compliance with the provisions of this code shall
be permitted to be continued in use as long as the _________
has determined that such use does not constitute a distinct hazard to life. - Answers-
authority having jurisdiction

Cylinder and cryogenic liquid container outlet connections shall be affixed in such a
manner as to be intregal to the valve, unremovable with ordinary tools or so designed
as to render the attachment point ____
when removal of the outlet connection is attempted. - Answers- unusable

What is required of the alarm system if another alarm condition occurs while the audible
alarm is manually silenced? - Answers- Re-initiation of the audible signal

Which of the following systems shall not be permitted to be located in an outdoor
enclosure? - Answers- Medical air compressor sources

Cylinders in use and in storage shall be prevented from reaching temperatures in
excess of _____. - Answers- 125°F

Locations for central supply systems shall have electrical devices protected from ____ -
Answers- physical damage

Mechanical exhaust for central supply locations shall not be more than ____ - Answers-
500 cfm

For purposes of this code, an oxygen enriched atmosphere is an atmosphere where to
total concentration of oxygen exceeds ____
by volume. - Answers- 23.5% , whereas bottom of the range is 19.5%,
21% is normal

Final line pressure regulators, when used for bulk cryogenic liquid systems shall be of a
____
design. - Answers- balanced

The pressure in the main line of each medical gas system, the operation and condition
of the source of supply and the reserve source (if any) shall be monitored at the ______
alarm - Answers- master

The instrument air dew point high alarm from each compressor site will indicate at the
master alarm panels when the line pressure dew point is greater than _____ - Answers-
-22°F _____ whereas the max is -44°F

, Brazed joints shall be made using a brazing alloy that exhibits a melting temperature in
excess of _____
to retain the integrity of the piping system in the event of fire. - Answers- 1000°F

Manifolds for gas cylinders shall consist of ______ equal headers; each with one
average day's supply, but not fewer than ______ connections. - Answers- Two-two

Manifolds for gas cylinders shall actuate a(n) _____
signal and shall activate an indicator at all _____
alarm panels to indicate when or just before changeover from one header to the other. -
Answers- Local - master

Area alarm not connected to master alarm - Answers- True

In a medical gas system with emergency reserve, which alarm systems) will activate
when, or just before, the changeover to the reserve supply occurs? - Answers- Master

The gas produced by evaporation from the secondary header in a cryogenic liquid
container system shall enter the supply system ______
of the final line regulator. - Answers- Upstream

A facility is in the planning stages of installing an emergency oxygen supply connection
(EOSC).
How many feet is the minimum clearance around this connection? - Answers- 3

A(n) _____ can be used as a substitute for the EOSC at a category 1 facility. -
Answers- in-building emergency reserve

Final line pressure controls shall be sized to ___ of the peak calculated demand. -
Answers- 100%

Bulk cryogenic liquid systems shall be installed in accordance with ____ - Answers-
NFPA 55

Central supply systems for nitrous oxide and carbon dioxide using cylinders or portable
containers shall be prevented from reaching temperatures lower than ___ °F -
Answers- 20

Installers of Category 1 medical gas piping systems must be qualified to ASSE 6010.
What is the certification requirement for installers of a Category 3 system? - Answers-
6010

When is the initial pressure test conducted by the installer? - Answers- after blowdown
of the distribution piping

Written for

Institution
MED GAS
Course
MED GAS

Document information

Uploaded on
November 16, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
2034
Member since
4 year
Number of followers
1447
Documents
50495
Last sold
1 hour ago

3.8

350 reviews

5
176
4
61
3
45
2
16
1
52

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions