100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
mssc test 1 with correct answers $10.99   Add to cart

Exam (elaborations)

mssc test 1 with correct answers

 1 view  0 purchase
  • Course
  • MSSC Quality
  • Institution
  • MSSC Quality

mssc test 1 with correct answers

Preview 2 out of 5  pages

  • November 17, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • MSSC Quality
  • MSSC Quality
avatar-seller
millyphilip
mssc test 1 with correct answers

First piece inspection is required for __________. - Answers -Documenting repeatable
setups

The quality management system that dedicates a full time team to solving problems is
called a __________ QMS. - Answers -Six Sigma

A history of dependability and customer satisfaction should be considered when
__________. - Answers -Evaluating a potential supplier

An employee should report to their supervisor if the following situation occurs: -
Answers -There is an increase in the number of defective parts produced by a machine.

The systematic way to eliminate activities that do not add value to the product in all
processes from customer order to delivery is called __________. - Answers -Lean
manufacturing

The quality plan documents how the company is going to reach its quality goals in the
scope of the __________. - Answers -Quality management system

Eliminating quality variances will result in __________. - Answers -Improved process
quality

Everyone within an organization is responsible for __________ quality. - Answers -
Improving

The performance of the product as viewed by the customer is ultimately the most
important measure of __________. - Answers -Product quality

Product development teams should perform a(n) __________ as early as possible
during their design process. - Answers -Design Failure Mode and Effects Analysis

The number of defects produced is a measure of __________. - Answers -The
effectiveness of a quality assurance system

Of the four roles of management, controlling covers which of the following actions: -
Answers -Monitoring actual to standard work performance

Spreadsheets are used to perform calculations in __________ and produce graphs. -
Answers -Rows and columns

, __________ should be validated and approved to ensure accuracy. - Answers -
Standard operating procedures

Greater variations in a process may occur when __________. - Answers -Unapproved
process adjustments are performed

Kaizen, Kanban, and 5S are just a few of many elements used in a(n) __________
operation. - Answers -Just In Time (JIT)

To make sure the appropriate parties are notified, use a __________. - Answers -
Predetermined distribution list

Companies typically include policies and procedures for continuous improvements as
part of their __________. - Answers -Quality assurance system

Joseph M. Juran, W. Edwards Deming, and C. Phillip Crosby contributed to the various
approaches of __________. - Answers -TQM, Total Quality Management

To reduce variation, minimize defects, and to shorten cycle time are considered
__________ goals. - Answers -Quality

The purpose of ISO 9000 is to help companies __________. - Answers -Improve quality

A worker should __________ any time the worker notices a minor quality problem that
is not critical to product function or performance. - Answers -Notify the supervisor to
determine the correct action to take

Defect prevention is the __________ of the four types of quality costs. - Answers -Most
cost effective

To identify and eliminate waste (non-value added) activities proves a company is
operating in __________. - Answers -A continuous improvement environment

Companies often __________ to create a baseline measurement for improvements in
machine performance. - Answers -Establish a metric

5S is a lean manufacturing technique that focuses on creating a(n) __________. -
Answers -Clean and orderly work area

A flat plane that is perpendicular to the direction of a measurement is a __________. -
Answers -Reference plane

What is the measurement shown on the rule? - Answers -3 17/32 inch

Two systems of dimensional measurement used in manufacturing are the SI Metric
System and the __________. - Answers -US customary system

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart