100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
BNSF Test 6 Questions and Answers $11.99   Add to cart

Exam (elaborations)

BNSF Test 6 Questions and Answers

 2 views  0 purchase
  • Course
  • BNSF
  • Institution
  • BNSF

BNSF Test 6 Questions and Answers

Preview 2 out of 9  pages

  • November 18, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • BNSF
  • BNSF
avatar-seller
millyphilip
BNSF Test 6 Questions and Answers

What must the transmitting employee say to indicate a radio transmission is complete
and no response is expected? (2.4) - Answers -Out

Trains must release Track and Time: (10.3b) - Answers -Before the time granted
expires

Before granting Track and Time, what must the control operator do to the control
machine to prevent movement into the limits? (10.3.1) - Answers -Apply blocking or
marking devices.

What is a fixed signal at the entrance of a block that governs trains entering and using
that block? (GL) - Answers -Block signal

Engines, cars, or equipment must not be detached and left standing entirely between
the opposing interlocking signals that govern movements at a railroad crossing at grade.
(9.19) - Answers -True

Who must communicate at once with the control operator when a call light is
illuminated? (9.24) - Answers -Any employee who sees it unless the employee is on a
moving train

Red flags are used in conjunction with: (MW 5.4.3) - Answers -Yellow-Red flags

Where the less-than-2-mile requirement applies, yellow flags will be placed between the
switches of a siding used for the meeting or passing of trains, and: (MW 5.4.2) -
Answers -A yellow flag must be placed adjacent to the siding tracks.

What is a block or interlocking signal without a number plate or designated by an "A"
marker? (GL) - Answers -Absolute signal

On-track equipment is defined as machines that may be operated on the rails, and
includes motor cars, push cars, trailers, hi-rail vehicles, cranes, tampers, power jacks,
ballast shapers, booms, trucks, and other similar equipment. (MW-GL) - Answers -True

Yard limits authorize on-track equipment to occupy a main track and perform work when
a block system is in effect to indicate condition of the block. (MW 6.3.1) - Answers -
False

, When the control operator has stopped a conflicting movement and both crews have
been advised of the move to be made: (9.12.1 - Answers -The control operator may
authorize another train to proceed in the same limits.

What is a series of consecutive blocks governed by block signals, cab signals, or both
and the signals are activated by a train or by certain conditions that affect the block
use? (GL) - Answers -Automatic Block Signal System

Within CTC, a train is stopped at a Stop signal, no conflicting movement is evident, and
the train is not within Track and Time limits. What action should the crew take? (9.12.1)
- Answers -Immediately contact the control operator.

Except when communication has failed, an emergency release must not be operated or
its seal broken: (9.18) - Answers -Without permission from the control operator or train
dispatcher

If a signal or signal appliance functions improperly or the track is damaged: (9.5.2) -
Answers -No movements on such routes may be permitted until the track and signal
appliance are examined and movement can occur safely.
Signals that govern movement on affected routes must display a Stop indication.

What is a block signal system that uses block signal indications to authorize train
movement? (GL) - Answers -Centralized Traffic Control

A red flag may be displayed between the rails: (MW 5.4.7) - Answers -On any track

Block signals, cab signals, or both: (9.3) - Answers -Govern the use of blocks

When signals are suspended, until informed that switches are lined for the main track
and locked in the hand position, movements over dual control switches must: (9.23.1) -
Answers -Not be made until train has stopped, switch is inspected, circuit is fouled, and
assured switches are properly lined

Track and Time may be granted for: (10.3.2) - Answers -Trains, Machines, track cars, or
employees

A train initiating movement between signals where there is no governing signal: (9.10) -
Answers -Must move at restricted speed until the leading wheels have passed the next
governing signal

What is a signal indication? (GL) - Answers -The action required by the signal aspect

When a train is approaching a Stop indication in CTC, the control operator knows there
is no conflicting movement, and the train is not within Track and Time limits, instructions
to proceed will be issued as follows: (9.12.1) - Answers -"After stopping, (train) at
(location) has authority to pass signal displaying Stop indication."

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart