PJM Sample Test Review Questions and Answers 100% Pass Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - ANSWER-off cost out of merit. Monitoring ___________ may give insights into system constraints. - ANSWER- Monitoring LMP's PJ...

[Show more]

Preview 3 out of 20  pages

  • November 19, 2024
  • 20
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • PJM Generation Dispatcher
  • PJM Generation Dispatcher
avatar-seller
SophiaBennett
PJM Sample Test Review Questions
and Answers 100% Pass

Real time transmission constraints or contingencies may be alleviated with generators

operating ______________ - ANSWER✔✔-off cost out of merit.


Monitoring ___________ may give insights into system constraints. - ANSWER✔✔-

Monitoring LMP's


PJM calls for _____________ reserves to recover ace so that tie line schedules are

maintained. - ANSWER✔✔-PJM calls on synchronized reserves


If not cancelled by PJM, the minimum generation alert expires at the end of the

specified ______________. - ANSWER✔✔-light load period


When PJM declares a hot weather alert, the generation dispatcher should determine if

maintenance can be deferred and notify all generating stations and key personnel. -

ANSWER✔✔-


During system restoration, the two categories of reserves are dynamic and spinning. -

ANSWER✔✔-


During system restoration, frequency should be maintained between 59.75 and 61.00

Hertz. - ANSWER✔✔-

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/20

,PJM issues a heavy load voltage schedule. Member companies who own generation

facilities should ensure voltage regulators on generating units are in service &

automatic. - ANSWER✔✔-


A unit being dispatched economically by PJM should set its megawatt output based on

the unit's dispatch rate or desired megawatt level. - ANSWER✔✔-


A fossil steam unit is considered fuel limited when it is not capable of running at its

maximum capacity for the next 72 hours - ANSWER✔✔-


During system restoration prior to synchronization of a unit, the dispatcher should

ensure sufficient load is available to stabilize unit operation. - ANSWER✔✔-


A large unit in an external control area near PJM/PJM West trips. The PJM operator will

see ace remain the same, frequency decrease. - ANSWER✔✔-


LMPs will change when marginal generator output changes - ANSWER✔✔-


The two control signals sent by the PJM E M S are regulation and dispatch rate (desired

MW output). - ANSWER✔✔-


An all-call is the one-way communication system used to disseminate information to

market operation centers. - ANSWER✔✔-


Real time bus prices may be monitored using data viewer. - ANSWER✔✔-


Not offering an available PJM capacity resource into the day ahead market is a violation

of PJMs two settlement market rules. - ANSWER✔✔-
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/20

, A unit that fails to start when scheduled, would be classified as an unplanned outage. -

ANSWER✔✔-


Maximum Generation Emergency is declared by PJM when generation is required

above the highest incremental economic cost. - ANSWER✔✔-


Maintenance outages are permitted when a unit can be held online until the following

Monday, and system reliability is not affected - ANSWER✔✔-


If PJM ace shows over-generation, actual imports are less than scheduled. -

ANSWER✔✔-


PJM will request a Supplementary Status Report when a Maximum Generation

Emergency Alert is issued. - ANSWER✔✔-


If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be

bid at maximum emergency. - ANSWER✔✔-


The loss of a large generation unit on the PJM system can be detected by monitoring

frequency and PJM ace. - ANSWER✔✔-


A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now

indicates under-generation of 1050 Megawatt. PJM should request 100% synchronized

reserves be loaded. - ANSWER✔✔-


Alerts are issued in advance of a scheduled load period to allow sufficient time for the

generation dispatcher to prepare for the anticipated capacity shortages - ANSWER✔✔-

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/20

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller SophiaBennett. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart