100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED AP BD+C PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED $13.49   Add to cart

Exam (elaborations)

LEED AP BD+C PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED

 0 view  0 purchase
  • Course
  • BC Owner Builder
  • Institution
  • BC Owner Builder

LEED AP BD+C PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED

Preview 4 out of 45  pages

  • November 19, 2024
  • 45
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • leed ap bdc practice
  • BC Owner Builder
  • BC Owner Builder
avatar-seller
StudySet
LEED AP BD+C PRACTICE QUESTIONS AND
ANSWERS 100% VERIFIED

what are the 8 LEED AP BD+C adaptations? - ANSWER New Construction and
Major Renovations
Core and Shell Development
Schools
Retail
Data Centers
Warehouses and Dist. Centers
Hoslitality
Healthcare


what are the 8 LEED AP BD+C adaptations? - ANSWER New Construction and
Major Renovations
Core and Shell Development
Schools
Retail
Data Centers
Warehouses and Dist. Centers
Hospitality
Healthcare


required LEED strategies are called ____ and optional LEED strategies are called
____ - ANSWER prereauisites; credits

,what are the LEED certification levels - ANSWER LEED certified, LEED silver,
LEED gold, LEED platinum


how many points are need for each LEED cert level? - ANSWER Cert: 40-49
points
Silver: 50-59 points
Gold: 60-79 points
Platinum: 80+ points


which certification feature is unique to LEED BD+C: Core and Shell? - ANSWER
Core and Shell projects can be precertified


list the 7 LEED impact categories - ANSWER 1. Reverse contribution to global
climate change
2. Enhance individual human health and well-being
3. Protect and restore water resources
4. Protect, enhance, and restore biodiversity and ecosystem services
5. Promote sustainable and regenerative material resource cycles
6. Build a greener economy
7. Enhance social equity, environmental justice, and community quality of life


what are the 4 general LEED certification steps - ANSWER 1. Register project
2. Prepare application
3. Submit application

,4. Receive certification


what are the 11 steps of the LEED Work plan? - ANSWER 1. Initiate discovery
phase
2. Select LEED rating system
3. Check minimum program requirements
4. Establish project goals
5. Define LEED project scope
6. Develop LEED scorecard
7. Continue discovery phase
8. Continue iterative process
9. Assign roles and responsibilities
10. Develop consistent documentation
11. Perform quality assurance review and submit for certification


for LEED BD+C projects, the construction phase review needs to be submitted no
later than ____________ after the project is substantially completed -
ANSWER 2 years


the ____________ was established to help project teams with multiple rating
system choices decide on a rating system and is based on the percentage of a
project's gross floor area that is appropriate for a particular rating system -
ANSWER 40/60 rule


list the 3 minimum program requirements (MPRs) - ANSWER 1. Must be in a
permanent location on existint land

, 2. Must use reasonable LEED boundaries
3. Must comply with project size requirements


the project ____________ process is designed to allow project teams to obtain
technical guidance on how LEED requirements, including MPRs, prereqs, and
credits, pertain to their projects - ANSWER credit interpretation ruling (CIR)


The LEED project boundary may not include land that is owned by a party other
than that which owns the LEED project unless the following is true: - ANSWER
The land owned by another owner is associated with and supports normal
building operations for the LEED project building


what are the 3 phases of the integrative process? - ANSWER 1. Discovery Phase
2. Implentation Phase (design and construction)
3. Occupancy, operations, and performance feedback phase


what are the 5 steps to the iterative process? - ANSWER 1. Conduct research
and collect data within the scope of work
2. Analyze the data
3. Share data analyses with team members at grouo workshops
4. Receive feedback to identify synergies, wastes, and other opportunities for
savings and efficiency across all of the disciplines
5. Create/refine design


what is the intent of IP prerequisite Integrative Project Planning and Design -
ANSWER to maximize opportunities for integrated, cost-effective adoption of
green design and construction strategies, emphasozing human health as a

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller StudySet. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart