Correctly Answered.
You are on a job and observe the coating is being applied in an unacceptable manner. As the inspector
you should: - CORRECT ANSWER Report to the contractor's supervisor
Report to the owner's representative
Which standard gives guidelines for how many DFT measurements should be taken in a given area? -
CORRECT ANSWER SSPC-PA 2
A prejob conference should be held: - CORRECT ANSWER After bids have been submitted and contracts
signed
Which of the following are goals of a prejob conference? - CORRECT ANSWER Review and discuss the
scope of work
Discuss lines of communication between parties
Discuss and clarify inspector's responsibilities and authority
What is one of the inspector's roles at a prejob conference? - CORRECT ANSWER Clarify reporting
requirements
According to ASTM D 4417 Method B - 2014, when taking measurements using a profile gauge, at each
location you should make? - CORRECT ANSWER Ten (10) readings per location, recording the maximum
value. Determine mean (average) for all maximum values as the reported profile
Daily reports or weekly reports should be written in? - CORRECT ANSWER Pen
Inspection records may be used to? - CORRECT ANSWER Help in resolving legal or arbitration disputes