100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CSLB B: California Contractor's License General Building (B): 2024/25 Questions and 100% CORRECT Answers $11.49   Add to cart

Exam (elaborations)

CSLB B: California Contractor's License General Building (B): 2024/25 Questions and 100% CORRECT Answers

 0 view  0 purchase
  • Course
  • CSLB B
  • Institution
  • CSLB B

CSLB B: California Contractor's License General Building (B): 2024/25 Questions and 100% CORRECT Answers The first step in any major construction job.? - ANSWER Clearing and Leveling Clearing the lot ensure.? - ANSWER That the various work crew will be able to perform their job effi...

[Show more]

Preview 3 out of 17  pages

  • November 21, 2024
  • 17
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CSLB B
  • CSLB B
avatar-seller
JPNAOMISTUVIA
California Contractor's License
General Building (B): 2024/25
Questions and 100% CORRECT




A
Answers




VI
TU
IS
The first step in any major construction job.? - ANSWER Clearing and Leveling

Clearing the lot ensure.? - ANSWER That the various work crew will be able to
M
perform their job efficiently
O

Underground Service Alert.? - ANSWER A free service that provides damage
prevention services
A



What will the underground service alert review.? - ANSWER All excavation plans
and will send a crew to mark to mark the location of the underground utilities that are
N



entering the property

The underground service alert most be notified at least? - ANSWER At least 2 days
JP




but no earlier than 14 days before the excavation begins

Failing to notify Dig Alert before the excavation is subject to? - ANSWER A civil
penalty in the amount not to exceed $10,000

If the underground service alert is not notified due to negligence the penalty will be ? -
ANSWER Up to $10,000

,If the Underground Service Alert is intentionally not notified the penalty will be ? -
ANSWER Up to $50,000

Color code indentifiers "white".? - ANSWER Proposed excavation

Color code identifier "Red".? - ANSWER Electric power lines, cables, conduit and
lighting cables

Color code identifier "orange"? - ANSWER Communication, alarm or signal lines,




A
cables or conduit




VI
Color code identifier " purple". ? - ANSWER Reclaimed water line, irrigation and
slurry lines




TU
Color code identifier " pink"? - ANSWER Temporary survey markings

Color code identifier " yellow"? - ANSWER Gas, oil, steam, petroleum or gaseous
materials
IS
Color code identifier " blue".? - ANSWER Potable water

Color code identifier " green"? - ANSWER Sewers and drains
M

Facilities identifiers? CH - ANSWER Chemical
O


Facilities identifiers? E - ANSWER Electrical
A



Facilities identifiers? FO - ANSWER Fiber optic
N




Facilities identifiers? G - ANSWER Gas

Facilities identifiers? LPG - ANSWER Liquefied petroleum gas
JP




Facilities identifiers? PP - ANSWER Petroleum Products

Facilities identifiers?RR - ANSWER Railroad signals

Facilities identifiers? S - ANSWER Sewer

Facilities identifiers? SD - ANSWER Storm Drain

, Facilities identifiers?SS - ANSWER Storm Sewer

Facilities identifiers? SL - ANSWER Steer light

Facilities identifiers? STM - ANSWER Steam

Facilities identifiers? SP - ANSWER Slurry system




A
Facilities identifiers? TEL - ANSWER Telephone




VI
Facilities identifiers? TS - ANSWER Traffic signal

Facilities identifiers? TV - ANSWER Televisión




TU
Facilities identifiers? W - ANSWER Water or reclaimed water purple

Leveling the property will provide? - ANSWER A flat even surface for the building
IS
foundation

How is the property leveling done? - ANSWER Through excavation and filling or
other filler materials such as rocks and concrete
M

According to the California Building Code the filling Material must be compacted."? -
O

ANSWER To at least 90%

Why additional fill material is Recomended when when initially adding fill material? -
A



ANSWER To allow for compaction
N




Soil can be either? - ANSWER Granular or cohesive

Soils are generally classified into three types? - ANSWER Type A,B and C
JP




Type A soil? - ANSWER Is highly cohesive it holds the greatest amount of weight on
average 1.5 tons per square feet or more, it is the most stable type of soil, with most
clay based soils falling into this category

Type B Soil.? - ANSWER Include a mixture of cohesive and granular soil. The
smaller particles will stick together providing support to the larges particles it can handle
a medium amount of compression between 0.5 and 1.5 tons per square feet

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller JPNAOMISTUVIA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart