Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Maryland Asbestos Exam Questions And Answers Updated 2024/2025

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
24-11-2024
Written in
2024/2025

©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e Maryland Asbestos Exam Questions And Answers Updated 2024/2025 The lean ratio of an extension ladder - answer4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - answer5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? - answer20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense - answerNeed a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials - answerPerformance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA - answerFull face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? - answer23.5% Chest XRays must be evaluated by what class reader? - answerClass B What is the APF for a full face air purifying respirator - answer50 Friable ACM is any material that can be: - answerCrushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is - answer0.1 f/cc over 8 hours TWA According to ASHERA, how many air samples must be taken for final clearance for NESHAP size project? - answer13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM ©THESTAR EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e Laboratories that perform PLM and TEM must be accredited by - answerNational Voluntary Laboratory Accreditation Program AHERA is for - answerPublic schools K-12 What is the notification requirement for asbestos projects in DC - answer10 working days prior to start NESHAP size projects and any project over 18 square feet of flooring. Building owner to notify tenants no less than 30 days prior to start of the project in writing What is a NESHAP sized project - answer160 square feet, 260 linear feet, or 35 cubic feet The competent person must inspect the work suits of the crew at least: - answerOnce a shift In Maryland, the asbestos project notification must be posted when and where? - answerThree days prior to any asbestos project, at all entrances and exits from the work site. NESHAP regulations provide definitions for - answerRenovations, Adequately Wet, and Demolitions The definition of PACM is - answerTSI and surfacing material found in a building constructed no later than 1980 The OSHA Asbestos in construction standard required employees to maintain exposure monitoring results for how many years? - answer30 years What is the safe level of asbestos exposure? - answerThere is no safe limit What is the purpose of aggressive air sampling? - answerSimulates the conditions in the work area Initial worker exposure air samples are collected: - answerTo predict what future exposures should be on this project According to OSHA construction standard, fall protection is required at working at or above - answer6 feet What info is required on a safety data sheet? - answerFirst aid procedures, emergency clean up procedures, type of PPE When conducting final air samples in Maryland, how many samples are needed? - answerOne per room, one per 5,000 sq feet of containment or 50,000 cubic feet of containment, whichever is greater Exposure minoring is the responsibility of the: - answerCompetent person

Show more Read less
Institution
Asbestos
Course
Asbestos

Content preview

©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.



Maryland Asbestos Exam Questions And
Answers Updated 2024/2025


The lean ratio of an extension ladder - answer✔4:1
According to AHERA, to complete a response action of a non-NESHAP size project, how many
samples must be taken with results of what? - answer✔5 samples taken inside with results of
each <0.0 f/cc

What are the notification requirements in Virginia? - answer✔20 calendar days for any project
greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or working linsense -
answer✔Need a license everywhere
Type of bond that would ensure that the general contractor will compensate subcontractors for
labor and materials - answer✔Performance Bond

Minimum respiratory protection on a class 1 asbestos project with no NEA - answer✔Full face
air purifying respirator
What is the maximum content permitted in the work area where an air purifying respirator is
being worn? - answer✔23.5%

Chest XRays must be evaluated by what class reader? - answer✔Class B

What is the APF for a full face air purifying respirator - answer✔50

Friable ACM is any material that can be: - answer✔Crushed, pulverized, reduced to powder by
hand pressure when dry

The OSHA permissible exposure limit is - answer✔0.1 f/cc over 8 hours TWA
According to ASHERA, how many air samples must be taken for final clearance for NESHAP size
project? - answer✔13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM




1|Page

, ©THESTAR EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
Laboratories that perform PLM and TEM must be accredited by - answer✔National Voluntary
Laboratory Accreditation Program

AHERA is for - answer✔Public schools K-12

What is the notification requirement for asbestos projects in DC - answer✔10 working days
prior to start NESHAP size projects and any project over 18 square feet of flooring. Building
owner to notify tenants no less than 30 days prior to start of the project in writing

What is a NESHAP sized project - answer✔160 square feet, 260 linear feet, or 35 cubic feet

The competent person must inspect the work suits of the crew at least: - answer✔Once a shift
In Maryland, the asbestos project notification must be posted when and where? -
answer✔Three days prior to any asbestos project, at all entrances and exits from the work site.

NESHAP regulations provide definitions for - answer✔Renovations, Adequately Wet, and
Demolitions

The definition of PACM is - answer✔TSI and surfacing material found in a building constructed
no later than 1980
The OSHA Asbestos in construction standard required employees to maintain exposure
monitoring results for how many years? - answer✔30 years

What is the safe level of asbestos exposure? - answer✔There is no safe limit

What is the purpose of aggressive air sampling? - answer✔Simulates the conditions in the work
area

Initial worker exposure air samples are collected: - answer✔To predict what future exposures
should be on this project
According to OSHA construction standard, fall protection is required at working at or above -
answer✔6 feet

What info is required on a safety data sheet? - answer✔First aid procedures, emergency clean
up procedures, type of PPE

When conducting final air samples in Maryland, how many samples are needed? - answer✔One
per room, one per 5,000 sq feet of containment or 50,000 cubic feet of containment, whichever
is greater

Exposure minoring is the responsibility of the: - answer✔Competent person



2|Page

Written for

Institution
Asbestos
Course
Asbestos

Document information

Uploaded on
November 24, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar Florida State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
679
Member since
2 year
Number of followers
178
Documents
26047
Last sold
1 day ago
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3.7

135 reviews

5
59
4
25
3
27
2
5
1
19

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions