Building Construction Exam #1 with
complete solutions
Setback - correct answer ✔✔Distance a building can be from a property boundary
Easement - correct answer ✔✔legal right held by one party to make use of the land of another
Right of Way (Easement) is - correct answer ✔✔legal right of a user to pass along specific route through
grounds of
property belonging to another
Land Surveying - correct answer ✔✔provides the detailed info. Required to assure that site prep and
construction coordinate the new work with existing work
Existing Condition Survey (Land Surveying) - correct answer ✔✔survey of utilities, infrastructure, built
structures
Topography survey (Site Assessment) - correct answer ✔✔area surface features in relief
Constriction Survey (Land Surveying) - correct answer ✔✔establishes exact locations of building points &
elevation
Environmental Assessment (Site Assessment) - correct answer ✔✔report prepared for the building site
that identifies potential existing environmental contamination. Ex. Brown field site- no one will build or
be on it, contaminated
Subsurface Investigation (Site Assessment) - correct answer ✔✔-determine the characteristics of the soil
through field-testing procedures or in a testing lab
, -Subsurface conditions affect foundation design, underground utilities, site paving, and excavation
methods
Site Plans (Site Assessment) - correct answer ✔✔detailed drawings that show the proposed
improvement for site development project - 1.e.,location arrangement, dimension, finish floor elevation,
site entrances, parking lots, etc.
Storm Control (Site Work Activities) - correct answer ✔✔natural or artificial removal of surface or
subsurface water from development area
Demolition (Site Work Activities) - correct answer ✔✔preparing for new constructing may involve
breakdown or removal of existing or buildings, roadways, parking area, and below grade elements
Site Remediation (Site Work Activities) - correct answer ✔✔result in long-term benefits for the building
site by preventing erosion, generating productive soils, restoring natural habitats, and removing toxic
substances
Grading (Earthwork) - correct answer ✔✔Altering a site's landform, usually by means of heavy
equipment, to provide a level area for structures, create movement
Sheeting (Earthwork) - correct answer ✔✔sheet piling, lagging, slurry walls used to support the face of
an excavation
Paving for Roadways and Parks - correct answer ✔✔Type of Earthwork
3 Types of Foundation - correct answer ✔✔Slab, Crawlspace (Conventional), Basement
Monolific - correct answer ✔✔one solid piece of concrete
Load Associated with a Foundation are - correct answer ✔✔• Vertical or lateral(horizontal)
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BravelRadon. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.