100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
FSR Practice Tests/Quizzes & Answers 100% Solved! $14.99
Add to cart

Exam (elaborations)

FSR Practice Tests/Quizzes & Answers 100% Solved!

 3 views  0 purchase
  • Course
  • FSR
  • Institution
  • FSR

What sized seam tape is used for a mechanically fastened seam? - ANSWERS6" What is the amount (or range) of tape exposure allowed at the seam? - ANSWERS1/8" to 1/2" What sizes do we offer for EPDM RUSS Strip? - ANSWERS6" and 9" What does DCR Format stand for? - ANSWERSDetail Condition Repa...

[Show more]

Preview 2 out of 14  pages

  • January 2, 2025
  • 14
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • FSR
  • FSR
avatar-seller
papersmaster01
FSR Practice Tests/Quizzes & Answers
100% Solved!
What sized seam tape is used for a mechanically fastened seam? - ANSWERS6"

What is the amount (or range) of tape exposure allowed at the seam? - ANSWERS1/8"
to 1/2"

What sizes do we offer for EPDM RUSS Strip? - ANSWERS6" and 9"

What does DCR Format stand for? - ANSWERSDetail Condition Repair

What size RUSS Strip can be used to create perimeter sheets? - ANSWERS9"

What must be applied to the membrane prior to seam tape? - ANSWERSprimer

What is required at cut edges of reinforced EPDM membrane? - ANSWERSLap Sealant

How wide do reinforced EPDM membrane sheets come in? - ANSWERS6.5', 8', 10'

What product are our EPDM T-joint covers made from? - ANSWERSUncured
Elastoform

Will a 20' wide roll of EPDM membrane be reinforced or non-reinforced? And will it be
dusted or Kleen? - ANSWERSNon Reinforced, dusted

When large openings on the side of a building exceed 10% of the total wall area on
which the openings are located, how many perimeter sheets are required to be centered
over the openings? - ANSWERS4

If a 5' high parapet wall is present at the edge of a roof, and the distance from the roof
deck to the ground is 30', is a perimeter sheet required? - ANSWERSyes

On the end lap on a mechanically fastened roof (10-year warranty), what size seam
tape may be used? - ANSWERS3"

When utilizing horizontal attachment of the 6" RUSS, the reinforced strip must be
positioned a minimum distance of 1/8" from the angle change. What is the maximum
distance that the reinforced strip may be placed? - ANSWERS6"

What are the three requirements of wood nailers? - ANSWERSwider than the flange,
securely fastened, and even with the insulation

, For up to a 20-year EPDM warranty, which products can be used to strip in the metal
flange of a U-1 Metal edge detail? - ANSWERS6" cover strip or overlayment

What is the coverage rate of 90-8-30A bonding adhesive? What is the shelf life? -
ANSWERS60 Sqft finished surface

12 months

What size SecurTAPE is required to complete a mechanically fastened seam? What
coverage must the SecurTAPE achieve past the edge of the plates? - ANSWERS6"

2"

If using Cav-Grip III to adhere EPDM Membrane to a wall, what must be done after
mating membrane to the substrate? - ANSWERSbroom & roll with hand roller

if deck, 150lbs roller

ON a U-5B (pressure-sensitive curb wrap) detail, what is required around the base of
the curb (prior to applying the primer)? - ANSWERSMechanical securement

What is the minimum and maximum SecurTAPE exposure? When overlapping two rolls
of SecurTAPE, how large must ethe SecurTAPE overlap be? - ANSWERS1/8" to 1/2",
1" overlap

When there is a T-joint on a roof with a warranty over 20 years, what is required? -
ANSWERS6" x 6" with 12" x 12" over top

When completing a U-1 edge detail, how far must the membrane extend over the wood
nailer? - ANSWERScomplete coverage of wood blocking

On U-15 corner details, how far must the fasteners and plates be from the inside or
outside corners? What product is the inside/outside corner made of? - ANSWERS6" - 9"
uncured elastoform

Where does the water cutoff mastic go on a U-9D (when termination bar is used to
terminate the membrane), & what is the minimum coverage rate of water cut off mastic?
- ANSWERSunder termination bar between the substrate and membrane, 7/16" bead,
10 Linear ft

How often must termination bar be fastened on a U-9D? - ANSWERS12" O.C.

When installing a U-8A pipe boot detail, how many penetrations can be flashed with one
pipe and how is the pipe boot terminated at the top? - ANSWERSone, water cut off
mastic and pipe clamp

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller papersmaster01. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

51292 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$14.99
  • (0)
Add to cart
Added