100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
BC OWNER BUILDER NEWEST 2025 ACTUAL EXAM COMPLETE 370 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! If workers are required to enter a trench over 1.2 m (4 ft) deep, the safe point of entry and exit must be $17.99
Add to cart

Exam (elaborations)

BC OWNER BUILDER NEWEST 2025 ACTUAL EXAM COMPLETE 370 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! If workers are required to enter a trench over 1.2 m (4 ft) deep, the safe point of entry and exit must be

 0 purchase

BC OWNER BUILDER NEWEST 2025 ACTUAL EXAM COMPLETE 370 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! If workers are required to enter a trench over 1.2 m (4 ft) deep, the safe point of entry and exit must be located:

Preview 4 out of 49  pages

  • January 16, 2025
  • 49
  • 2024/2025
  • Exam (elaborations)
  • Unknown
All documents for this subject (7)
avatar-seller
Bestnursesteve
BC OWNER BUILDER NEWEST 2025 ACTUAL EXAM
COMPLETE 370 QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED
A+||BRAND NEW!!


If workers are required to enter a trench over 1.2 m (4 ft) deep, the safe point of entry
and exit must be located:

a) within 8 m (25 ft) of the workers and the excavation must be
safely supported or sloped to the entry and exit location.
b) within 5 m (16 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location.
c) within 7 m (23 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location.
d) within 10 m (32 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location. - ✔✔ANSWER✔✔>>a

If workers are required to enter a trench over 1.2 m (4 ft) deep, the safe point of entry
and exit must be located:


a) within 5 m (16 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location.
b) within 7 m (23 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location.
c) within 8 m (25 ft) of the workers and the excavation must be
safely supported or sloped to the entry and exit location.
d) within 10 m (32 ft) of the workers and the excavation must be safely supported or
sloped to the entry and exit location. - ✔✔ANSWER✔✔>>c

What is the design and construction that prevents
water from ever entering?

a) Principle of driving rain deterrent
b) Principle of driving rain deflection
c) Principle of rainwater deterrent
d) Principle of rainwater deflection - ✔✔ANSWER✔✔>>d

The higher grit number is equivalent to:

,a) a finer abrasive, which creates smoother surface
finishes.
b) a finer abrasive, which creates a rougher surface finish.
c) a rougher abrasive, which creates smoother surface
finishes.
d) a rougher abrasive, which creates a rougher surface finish. - ✔✔ANSWER✔✔>>a

The vertical height of any flight of stairs shall not exceed
a) 4.5 m or 15 ft
b) 3.7 m or 12 ft
c) 3.5 m or 11.5 ft
d) 2.8 m or 9 ft - ✔✔ANSWER✔✔>>b

Extend the ladder at least ____ above the landing platform or the point of support.

a) 1.5 m (5 ft)
b) 2 m (6.3 ft)
c) 1 m (3 ft)
d) .5 m (1.5 ft) - ✔✔ANSWER✔✔>>c

for every four feet in height, the base of the ladder should be moved ___ foot out from
the wall or structure. - ✔✔ANSWER✔✔>>1

Use a ___ ratio for setting ladders (approximately 75 degrees) to determine how far out
the base of the ladder should be moved in relation to the height of the ladder against the
wall. - ✔✔ANSWER✔✔>>4:1

To be effective, mechanical ventilation systems must be able to
a) Distribute ventilation air to most rooms of the house and exhaust air from kitchens,
bathrooms, and laundry rooms.
b) Exhaust air from kitchens, bathrooms, and laundry rooms.
c) Distribute ventilation air to bedrooms and common spaces
d) Distribute ventilation air to most bedrooms and exhaust air from bathrooms and
laundry rooms. - ✔✔ANSWER✔✔>>a

____________ performs routine remote and physical inspections on gas work and gas
equipment in commercial, industrial, and residential premises.
a) Worksafe BC
b) Regional District Building Inspectors
c) Technical Safety BC - ✔✔ANSWER✔✔>>c

If your property is in Technical Safety BC jurisdiction, homeowners can apply for an
electrical homeowner permit.

T or F? - ✔✔ANSWER✔✔>>T

,Shingles should overlap the valley lining by at least ____
a) 12 inches.
b) 6 inches.
c) 2 inches.
d) 5 inches. - ✔✔ANSWER✔✔>>b

The moisture trapped within the membranes will form bubbles on the surface of the flat
roof. As moisture builds up on the roof, the bubbles will eventually grow and pop,
forming a blister. The moisture is formed by ___________
a) excessive heat and poor attic ventilation.
b) excessive cold and poor attic ventilation.
c) excessive heat and excessive attic ventilation.
d) excessive cold and excessive attic ventilation. - ✔✔ANSWER✔✔>>a

If any condensation forms on the inside of your skylight, the weep holes allow the water
to drain out of your home. The condensation can end up dripping into your home
instead if ____
a) too many holes are present.
b) these holes are not properly caulked.
c) these holes are blocked by debris.
d) the holes are installed on the downward slope - ✔✔ANSWER✔✔>>c

The weep holes in skylights allow the _______
a) air exchange
b) water to drain out of your home
c) condensation to get trapped
d) caulking to adhere the skylight tightly to the mount - ✔✔ANSWER✔✔>>b

The depth of a concrete slab control joint should be equal to ______

a) one eighth of the thickness of the slab.
b) one half of the thickness of the slab.
c) twice the thickness of the slab.
d) one fourth of the thickness of the slab. - ✔✔ANSWER✔✔>>d

To ensure that the foundation of your home isn't a major source of heat loss,
you should install rigid insulation before pouring concrete.

T or F? - ✔✔ANSWER✔✔>>T

For the nailing pattern on the staircase header, use BC code section 9
(I looked this up here chrome-
extension://efaidnbmnnnibpcajpcglclefindmkaj/https://free.bcpublications.ca/civix/docum

, ent/id/public/bcbc2018/bcbc_2018dbp9n and I cant find any info on it at all outside of
the above note from the cheat sheet). answer: T - ✔✔ANSWER✔✔>>T

Notice of project does not need to be submitted to WorkSafeBC prior to building. T or F
- ✔✔ANSWER✔✔>>F
Ends of wood joists, beams and other members framing into masonry or concrete shall
be treated to prevent decay where the bottom of the member is at or below ground
level, or a 20 mm air space shall be provided at the end and sides of the member. T or
F - ✔✔ANSWER✔✔>>F

6 mil poly moisture permeability is ______

a) 0.03 US perm (1.7 SI perm) or 1.7 ng.
b) 0.05 US perm (2.2 SI perm) or 2.2 ng. - ✔✔ANSWER✔✔>>a

WorkSafeBC can come anytime to your job site. T or F - ✔✔ANSWER✔✔>>T

Using ______ is the best way to build a watertight wall.
a) eaves
b) siding
c) a rain-catch
d) a rainscreen - ✔✔ANSWER✔✔>>d

As an owner builder, you may not offer to sell or sell the new home during construction
or until at least five years after your home is first occupied, unless HPO approved. T or
F - ✔✔ANSWER✔✔>>F

As an owner builder, you may not offer to sell or sell the new home during construction
or until at least one year after your home is first occupied, unless HPO approved. T or F
- ✔✔ANSWER✔✔>>T

To square a 12 x 9 room the diagonal should be _____
a) 5
b) 50
c) 15
d) 25 - ✔✔ANSWER✔✔>>c

With bifold doors, most adjustments involve positions of ________

a) king and jack stud
b) the pivot pins at the top and bottom near the side where the door meets the door
frame.
c) the hinge location at the far left or right, where the door meets the frame -
✔✔ANSWER✔✔>>b

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Bestnursesteve. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

69605 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$17.99
  • (0)
Add to cart
Added