UPDATED Exam Questions and CORRECT
Answers
The following are some types of construction project risk, except:
A: Regulatory environment
B: Project complexity
C: Funding
D: Organization Structure
E: None of the choices - CORRECT ANSWER - E: None of the choices;
A: Regulatory environment
B: Project complexity
C: Funding
D: Organization Structure
E: None of the choices
the parameters define the overall extent of work to be included in a construction contract -
CORRECT ANSWER - Scope of the project
A supplemental drawing to the plans and specifications that details the fabrication method,
materials and models of a product of installation associated with the project - CORRECT
ANSWER - shop drawings
it is a process of awarding contract to subcontractors and issuing purchase order for materials
and equipment . - CORRECT ANSWER - buy out
a request made by the owner to add or subtract features to the scope of the project resulting in
changes to the contract - CORRECT ANSWER - change order
,a daily amount of money paid by the contractor to the owner for each day that the project fails to
meet the completion date specified in the contract - CORRECT ANSWER - liquidated
damage
a change or addition to the contract documents issued after the documents have been released but
before the bid is due - CORRECT ANSWER - addenda
a contract document set consists of - CORRECT ANSWER - agreement, construction
drawings, specifications, addenda, general and supplementary condition.
the shop drawings are prepared by the - CORRECT ANSWER - fabricator
in the traditional project delivery method for buildings, the day-to-day supervision of the
construction is generally the responsibility of the - CORRECT ANSWER - general
contractor
what is the first known recorded building code that outlines the roles and duties of the master
builder - CORRECT ANSWER - Code of Hammurabi
in the Construction Management (CM) method of project deliver, there is normally no general
contractor - CORRECT ANSWER - true
in the construction management at risk (CMAR) method of project delivery, the construction
manager:
A-advises the owner with respect to construction cost during the design phase
B-manages the project's construction during the construction phase
C-works as the general contractor for the project
D- all of the above
E- only a and b - CORRECT ANSWER - all of the above;
, what project delivery method in which only one firm is contracted for both design and
construction of the project? - CORRECT ANSWER - design-build
what delivery method is best used if it's a highly technical in nature of project that requires good
communication and coordination needs to occur between designers and builder? - CORRECT
ANSWER - design-build
what delivery method in which there is no or limited input from contractors and subcontractors
during the design phase - CORRECT ANSWER - design-bid-build
turnkey method is a variation of what delivery method where it also involves arranging for land
and financing of the project - CORRECT ANSWER - design-build
what delivery method is when it is hard to get real up-front fixed price, or price may not be
known until it is actually built? - CORRECT ANSWER - design-build
what delivery method in which the owner assumes full responsibility on all liability risk during
the construction stage - CORRECT ANSWER - CM
the Master Format has been developed by the: - CORRECT ANSWER - CSI, Construction
Specification Institute
the UNIFORMAT II has been developed by the: - CORRECT ANSWER - ASTM;
American Standard for Testing and Materials
the current Master Format has how many divisions? - CORRECT ANSWER - 50, 0-49
the current UNIFORMAT II consists of how many divisions? - CORRECT ANSWER - six
in the traditional project delivery method, the owner has separate contracts with the general
contractor and the subcontractor - CORRECT ANSWER - false