100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
22-02-2025
Written in
2024/2025

ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I

Institution
ACI
Course
ACI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI
Course
ACI

Document information

Uploaded on
February 22, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE
I

The sensor of the temperature measuring device shall be submerged a minimum of
_____ in. [_____mm] into the freshly mixed concrete. - Answers - 3 in. [75 mm]

The temperature measuring device shall have a capacity of measuring temperature of
freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of
_____. - Answers - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]

The temperature measuring device shall be calibrated _____, or whenever there is a
question of _____. - Answers - Annually, accuracy

The temperature of concrete may be measured in a wheelbarrow. True or False? -
Answers - True

The temperature of concrete may be measured in a wall form. True of False - Answers -
True

A composite sample of concrete is required even if the only purpose for obtaining the
sample is to determine temperature. True of False? - Answers - False

What must be done to the sample container prior to sampling the concrete? - Answers -
Dampen (with water)

What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in the fresh concrete. - Answers - Gently press the concrete
around the temperature measuring device at the surface of the concrete

How long must the temperature measuring device remain in the freshly mixed concrete?
- Answers - At least 2 minutes but not more than 5 minutes

Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - Answers - Compliance

This method covers sampling from four types of mixtures which are _____, _____,
_____, and _____. - Answers - Stationary mixers, paving mixers, revolving drum mixers,
and open top mixers

The maximum allowable time between obtaining the first and final portions of a
composite sample is _____ minutes. - Answers - 15

Portions of a composite sample shall be thoroughly remixed bfore beginning tests on
the sample. True of False? - Answers - True

, The maximum elapsed time allowed between obtaining the final portion of the
composite sample and beginning the tests for slump, temperature, and air content is
_____ minutes. - Answers - 5

The molding of strength test specimens shall begin within _____ minutes after
fabricating the composite sample. - Answers - 15

The concrete sample must be protected from contamination and _____. - Answers -
Rapid evaporation

The minimum size sample for making strength test specimens is _____. - Answers - 28
L (1ft^3)

When sampling from a stationary mixer, the batch must be sampled at _____ or more
regularly spaced intervals during discharge of the middle portion of the batch - Answers
-2

The composite sample for a paving mixer must represent a minimum of _____ different
portions of the batch of concrete taken from the pile after discharge. - Answers - 5

After the temperature of the concrete is read, what is required? - Answers - Reporting of
temperature

The temperature of concrete is reported to the nearest _____ degrees F [_____ C] -
Answers - 1 degree F [0.5 C]

According to ASTM C1064, what is one reason to take the temperature of concrete? -
Answers - Verify conformance to a specified requirement for temperature of concrete

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of
False? - Answers - False

The sample of concrete used for temperature determination must be rodded 25 times.
True or False? - Answers - False

When sampling from a revolving drum truck mixer, concrete must be sampled at a
minimum of _____ regularly spaced intervals during discharge of the middle portion of
this batch. - Answers - 2

Concrete samples from a truck mixer must be obtained before any water or admixtures
are added to the mixer at the job site. True or False? - Answers - False

The composite samples from a truck mixer must be obtained from the _____ portion of
the batch. - Answers - Middle

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA YALA UNIVERSITY
View profile
Follow You need to be logged in order to follow users or courses
Sold
1998
Member since
3 year
Number of followers
1444
Documents
46903
Last sold
3 days ago

3.8

342 reviews

5
170
4
61
3
44
2
16
1
51

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions