PROJ430 Advanced Project Management
Devry University
All 2 results
Sort by
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
As you read this, a fellow student has made another $4.70
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia