CSLB B (CSLBB)

Eastern Arizona College

Here are the best resources to pass CSLB B (CSLBB). Find CSLB B (CSLBB) study guides, notes, assignments, and much more.

All 2 results

Sort by

CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE.
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE.

  • Exam (elaborations) • 31 pages • 2022
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE. If unused mortar stiffens due to hydration of cement, what must you do? - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - 24-48 Hours How long should you wait before installing tile on a shower pan? - 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Type-B Soil...
    (0)
  • $10.49
  • + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE.
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE.

  • Exam (elaborations) • 31 pages • 2022
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST UPDATE. If unused mortar stiffens due to hydration of cement, what must you do? - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - 24-48 Hours How long should you wait before installing tile on a shower pan? - 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Type-B Soil...
    (0)
  • $10.49
  • + learn more