PROJ430 Advanced Project Management
Devry University
All 2 results
Sort by
![Final Exam |Elaborated| PROJ430 - Advanced Project Management](/docpics/613818e7c1bc8_1286180.jpg)
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
ProfExams
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
![Final Exam |Elaborated| PROJ430 - Advanced Project Management](/docpics/613818adb37cf_1286179.jpg)
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
Sturdydrone
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia