Corrosion Specialistdesigns and certifies cathodic protection system 
Secondary containment shall be constructed to contain at least the following volumes:A. 
100% of usable capacity of primary where there is only one primary is within the secondary 
B. 150% of the largest container if there are multiple primary containers in a single secondary 
Cathodic protection tester will test cathodic protection system within __ months of installation 
and every __ years thereafter6 months 
3 years 
Spill ...
Which of the following is not considered "hanging hardware"? 
a. nozzle 
b. swivel 
c. whip hose 
d. shear valved. shear valve 
Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-1000 pump is below 
____ inches of WC, the dispenser should be removed from service. 
A. 50 
B. 60 
C. 75 
D. 100B. 60 
In a coaxial hose for a balance system, the product flows through the ____? 
A. the belllows 
B. the inner hose 
C. the outer hose 
D. both hosesB. the
After backfilling the vapor return and vent lines, the maximum pressure drop through the system 
shall not exceed ________at 60 cubic feet per hour as determined by TP-201.4, Dynamic 
Backpressure. 
a. 0.75 inches WC 
b. 0.5 inches WC 
c. 0.32 inches WC 
d. 0.55 inches WCc. 0.5 inches WC 
CARB's most recent vapor recovery regulations are known as: 
a. EVR (enhanced vapor recovery) 
b. CVR (California vapor recovery) 
c. PVR (protective vapor recovery) 
d. ORVR (onboard refueling vapor recovery)...
Which of the following is not considered "hanging hardware"? 
a. nozzle 
b. swivel 
c. whip hose 
d. shear valved. shear valve 
Per Executive Order. VR-201-E, if the dispensing vacuum of the Healy VP-1000 pump is below 
____ inches of WC, the dispenser should be removed from service. 
A. 50 
B. 60 
C. 75 
D. 100B. 60 
In a coaxial hose for a balance system, the product flows through the ____? 
A. the belllows 
B. the inner hose 
C. the outer hose 
D. both hosesB. the inner hose
After backfilling the vapor return and vent lines, the maximum pressure drop through the system 
shall not exceed ________at 60 cubic feet per hour as determined by TP-201.4, Dynamic 
Backpressure. 
a. 0.75 inches WC 
b. 0.5 inches WC 
c. 0.32 inches WC 
d. 0.55 inches WCc. 0.5 inches WC 
CARB's most recent vapor recovery regulations are known as: 
a. EVR (enhanced vapor recovery) 
b. CVR (California vapor recovery) 
c. PVR (protective vapor recovery) 
d. ORVR (onboard refueling vapor recover...
Corrosion Specialistdesigns and certifies cathodic protection system 
Secondary containment shall be constructed to contain at least the following volumes:A. 
100% of usable capacity of primary where there is only one primary is within the secondary 
B. 150% of the largest container if there are multiple primary containers in a single secondary 
Cathodic protection tester will test cathodic protection system within __ months of installation 
and every __ years thereafter6 months 
3 years 
Spil...
ICC Test questions and answers 100% verified. 
 
 
 
 
 
 
 
 
 
 
spill prevention equipment consists of a spill bucket that is intended for.... - correct answers.Catching product when transfer hose is detached. 
 
Which statement regarding manual inventory reconciliation is true..... - correct is no longer an approved method of non-visual monitoring of existing UST systems. 
 
An approved method of leak detection for an underground pressurized piping system includes... - correct answers.A dev...
Phase 1 equipment is related to all of the following except: correct answers Dispenser mounted vapor recovery equipment 
 
According to EO VR-201/202-N, the only authorized hose configuration is: correct answers Any Hose Configuration 
 
The most current ARB approved Phase II vapory recovery is: correct answers EVR 
 
When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all of the following to eliminate the potentials problem except: correct answers...
ICC SOILS 1 – 14 QUESTIONS AND ANSWERS 
 
 
1.	Who hires the Special inspector?: The Owner or Registered Design Profes- sional in Responsible Charge acting as the owner's agent. 
2.	The Special Inspector is approved by and shall demonstrate competence to the 	.: BO 
RDP 
3.	Fill in the blank 
Upon arrival at a jobsite, the Special Inspector shall check in with the 	.- 
: Contractor 
SIM p.16 
4.	Final report goes to...?: BO
Who hires the Special inspector? - Answer- The Owner or Registered Design Professional in Responsible Charge acting as the owner's agent. 
 
The Special Inspector is approved by and shall demonstrate competence to the _____. - Answer- Building Offical 
Registered Design Professional in Responsible Charge 
 
Upon arrival at a jobsite, the Special Inspector shall check in with the _____. - Answer- Contractor 
 
SIM p.16 
 
Final report goes to...? - Answer- BO 
 
Who do you notify first after an ...