PROJ430 Advanced Project Management
Devry University
All 2 results
Sort by
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
-
Final Exam |Elaborated| PROJ430 - Advanced Project Management
- Exam (elaborations) • 39 pages • 2021
-
- $12.49
- + learn more
Final Exam |Elaborated| PROJ430 - Advanced Project Management 
 
PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
Get paid weekly? You can!
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia