- Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ? On this page you'll find 5 study documents about .

All 5 results

Sort by

BCN 3761 FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2025 GRADED A+
  • BCN 3761 FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2025 GRADED A+

  • Exam (elaborations) • 8 pages • 2025
  • BCN 3761 FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2025 GRADED A+ t/f; the general conditions are comparable to the "general clauses" in a typical business contract - Answers true t/f; general conditions define the rights, responsibilities, and relationships of entities involved in the performance of the contract - Answers true t/f; general conditions are an inherent part of the owner-contract agreement - Answers true t/f; general Conditions establish basic responsibilities for th...
  • TutorJosh
    (0)
  • $9.99
  • + learn more
BCN 3761 Midterm Exam | Questions with Verified Answers
  • BCN 3761 Midterm Exam | Questions with Verified Answers

  • Exam (elaborations) • 11 pages • 2025
  • BCN 3761 Midterm Exam | Questions with Verified Answers What are the three basic types of documents used in construction contracts? A. Bidding and Contract Requirements b. Drawings c. Specifications d. Marketing data Which of the following are included in the bidding documents but not in the construction contract documents? A. Instructions to Bidders b. General Conditions of the Contract c. Agreement Form d. Bid Form T/F; specifications describe the construction in text form True T/F; constru...
  • Bri254
    (0)
  • $17.99
  • + learn more
BCN 3761 Final Exam | With Verified Answers
  • BCN 3761 Final Exam | With Verified Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • BCN 3761 Final Exam | With Verified Answers T/F; general conditions produced by professional associations rarely require modifications True Which of the following is not a responsibility of the architect/engineer according to the general conditions determine the scope of work performed by subcontractors Which does not publish preprinted general conditions the construction specifications institute (CSI) T/F; the general conditions are comparable to the "general clauses" in a typical business ...
  • NurseHenny
    (0)
  • $13.99
  • + learn more
BCN 3761 Midterm Exam| 100% Correct Answers
  • BCN 3761 Midterm Exam| 100% Correct Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • BCN 3761 Midterm Exam| 100% Correct Answers What are the three basic types of documents used in construction contracts? a. Bidding and Contract Requirements b. Drawings c. Specifications d. Marketing data Which of the following are included in the bidding documents but not in the construction contract documents? a. Instructions to Bidders b. General Conditions of the Contract c. Agreement Form d. Bid Form T/F; specifications describe the construction in text form True T/F; construction specifi...
  • NurseHenny
    (0)
  • $15.49
  • + learn more
BCN3761 MIDTERM CH 1-8 (LATEST) QUESTIONS WITH COMPLETE SOLUTIONS 2024!!
  • BCN3761 MIDTERM CH 1-8 (LATEST) QUESTIONS WITH COMPLETE SOLUTIONS 2024!!

  • Exam (elaborations) • 17 pages • 2024
  • BCN3761 MIDTERM CH 1-8 (LATEST) QUESTIONS WITH COMPLETE SOLUTIONS 2024!!
  • EvaTee
    (0)
  • $14.99
  • + learn more