Aci final exam Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aci final exam? On this page you'll find 204 study documents about Aci final exam.
Page 2 out of 204 results
Sort by
![ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.](/docpics/4926157/660fae23e40c3_4926157_121_171.jpeg)
-
ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers. 
The sensor of the temperature measuring device shall be submerged a minimum 
of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature 
of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of 
_____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] 
The te...
![ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+](/docpics/5178738/6634af8d249b3_5178738_121_171.jpeg)
-
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+. ASTM C1064 Answer - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement 
Concrete 
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into 
the freshly mixed concrete. Answer - 3" 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to ± ______ °F throughout a range of ____________. Answ...
![ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+](/docpics/5194977/6636bdf663954_5194977_121_171.jpeg)
-
ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+. The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into 
the freshly mixed concrete. Answer - 3" 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 
degrees 
The temperature measuring device shall be calibrated ______ , or w...
![ACI Written Exam Questions and Answers Already Passed](/docpics/4973848/6617a8b18893a_4973848_121_171.jpeg)
-
ACI Written Exam Questions and Answers Already Passed
- Exam (elaborations) • 20 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
ACI Written Exam Questions and 
Answers Already Passed 
 
The sensor of the temperature measureing device shall be submerged a minimum of ____ in 
3 (75mm) 
 
The temperature measureing device shall have a capacity of measuring temperature of freshly 
mixed conrcrete to +-_____ degrees F throught a range of _____ 1(.5 degrees C), 30-120 (0- 
50 degrees C) 
 
The temperature measuring device shall be calibrated____, or whenever there is a question of 
_____ annually, accuracy 
 
The temp of concr...
![ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+.](/docpics/5200461/6637dd4cefd7d_5200461_121_171.jpeg)
-
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+.
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+. The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into 
the freshly mixed concrete. Answer - 3" 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 
degrees 
The temperature measuring device shall be calibrated ______ ...
![ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.](/docpics/4921016/660eee350c22b_4921016_121_171.jpeg)
-
ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers.
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
ACI Concrete Field Testing Technician- Grade I Exam 2023/2024 Questions and with Correct Answers. 
The sensor of the temperature measuring device shall be submerged a minimum 
of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature 
of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of 
_____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] 
The te...
![Concrete ACI Exam Questions And Answers Graded A+](/docpics/5256032/663e1b0b2e5d6_5256032_121_171.jpeg)
-
Concrete ACI Exam Questions And Answers Graded A+
- Exam (elaborations) • 15 pages • 2024
-
- $10.69
- + learn more
Concrete ACI Exam Questions And Answers Graded A+ 
What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? 
Add additional concrete to keep an excess of concrete above the top of the mold at all times 
 
 
Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 
25 
 
 
The slump mold is filled in _____ layers. 
3 layers 
 
 
True or false the slump mold should be in a dry condition before beginning the test?...
![ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass](/docpics/4635867/65e187f9877c3_4635867_121_171.jpeg)
-
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass
- Exam (elaborations) • 52 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
ACI- Concrete Field-Testing Technician 
- Grade 1 Exam Questions and 
Answers 100% Pass 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the 
composite sample. 
A. True 
B. False - Answer- B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the 
composite sample may not exceed 5 minutes. 
A. True 
B...
![ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | SCORED A+](/docpics/5178904/6634b4f018a34_5178904_121_171.jpeg)
-
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | SCORED A+
- Exam (elaborations) • 11 pages • 2024
-
- $12.99
- + learn more
ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 | SCORED A+. The sensor of the temperature measuring device shall be submerged a minimum of _____ in. 
[_____mm] into the freshly mixed concrete. - Correct Answer - 3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Correct Answer - 1 degree F 
[0.5 C], 30 degrees F to 120...
![ACI Exam Practice Questions & Answers (RATED A)](/docpics/4986363/66194801eb5c0_4986363_121_171.jpeg)
-
ACI Exam Practice Questions & Answers (RATED A)
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
ACI Exam Practice Questions & Answers (RATED A)ACI Exam Practice Questions & Answers (RATED A)ACI Exam Practice Questions & Answers (RATED A)ACI Exam Practice Questions & Answers (RATED A)ACI Exam Practice Questions & Answers (RATED A) 
60-80*F - ANSWER For normal strength concretes, what temperature range must be maintained for test cylinders during initial curing? 
 
5 minutes - ANSWER Tests for the slump and air content must be started within ____ after obtaining the final portion of the comp...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia