Building drain - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Building drain? On this page you'll find 1632 study documents about Building drain.

Page 2 out of 1.632 results

Sort by

S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test Spring 2023.
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test Spring 2023.

  • Exam (elaborations) • 20 pages • 2023
  • Certificate of Fitness for Citywide Sprinkler Systems (S-12) S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test Spring 2023. THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDERED PLANN...
    (0)
  • $13.09
  • 8x sold
  • + learn more
MI Residential Builder Test Prep Questions With Complete Solutions
  • MI Residential Builder Test Prep Questions With Complete Solutions

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • A foundation drain shall extend past the outside edge of the footing at least how far? correct answer: 12" A concrete masonry foundation wall extends below grade and will require parge coating using Portland cement mortar. What is the minimum allowable thickness? correct answer: 3/8" Which is the first step that needs to be taken prior to starting any excavation work? correct answer: contacting the local utility companies Before excavating for a new building, how should subsoil con...
    (0)
  • $10.49
  • 2x sold
  • + learn more
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler test THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. - Answer ️️ -OWNER RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. - Answer ️️ -3 THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. - Answer ️️ -IMPAIRMENT COORDINATOR REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDERED PLANN...
    (0)
  • $12.49
  • 1x sold
  • + learn more
Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss
  • Michigan residential builders maintenance and alterations 5 practice exam with 100% correct answerss

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • SITEWORK, FOOTING, AND FONDATIONS FIRST SECTION A foundation drain shall extend past the outside edge of the footing at least how far? 12 inches What are batter boards? Stakes and ledger boards marking building lines. What is the purpose of a cove or can't strip at a foundation joint? Deflect water from the foundation wall. What is the MINIMUM overlap for the joints in the polyethylene film moisture barrier applied over the exterior of a below grade foundation wa...
    (1)
  • $13.99
  • 1x sold
  • + learn more
NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64
  • NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64 Mason has suffered a $42,000 loss to his commercial building due to fire. The building is covered under the Building & Personal Property coverage form and had been vacant for 74 days. The insurer would have paid the entire loss if the building had been occupied, but what will they pay because the insured building was considered vacant? $28,980. $42,000. $6,300. $35,700. - ANS For a loss that would otherwise be covered f...
    (1)
  • $10.49
  • 1x sold
  • + learn more
Massachusetts Plumbers Journeyman Exam Questions And Answers
  • Massachusetts Plumbers Journeyman Exam Questions And Answers

  • Exam (elaborations) • 60 pages • 2024
  • Massachusetts Plumbers Journeyman Exam Questions And Answers Existing Work - answerA plumbing system or any part thereof installed prior to March 11, 2005. Soil Pipe - answerAny pipe that conveys the discharge of toilets, urinals or fixtures having similar functions to the building drain or building sewer. The discharge may be conveyed with or without the discharge from other fixtures Water Distribution Pipe - answerA pipe within the building or on the premises that conveys water from the water ...
    (0)
  • $9.99
  • 1x sold
  • + learn more
Massachusetts Plumbers Journeyman Exam Questions And Answers With Verified Solutions
  • Massachusetts Plumbers Journeyman Exam Questions And Answers With Verified Solutions

  • Exam (elaborations) • 23 pages • 2023
  • Available in package deal
  • Massachusetts Plumbers Journeyman Exam Questions And Answers With Verified Solutions Existing Work A plumbing system or any part thereof installed prior to March 11, 2005. Soil Pipe Any pipe that conveys the discharge of toilets, urinals or fixtures having similar functions to the building drain or building sewer. The discharge may be conveyed with or without the discharge from other fixtures Water Distribution Pipe A pipe within the building or on the premises that conveys water from th...
    (0)
  • $14.49
  • 1x sold
  • + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED)
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED)

  • Exam (elaborations) • 31 pages • 2023
  • Available in package deal
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED) CSLB B LICENSE GENERAL CONTRACTOR EXAM- QUESTIONS & ANSWERS (100% VERIFIED) If unused mortar stiffens due to hydration of cement, what must you do? - ANSWER - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - ANSWER - 24-48 Hours How long should you wait before installing tile on a shower pan? - ANSWER - 24 Hours Unstable dry rock, angular gravel, sandy loam, and coh...
    (0)
  • $12.99
  • 1x sold
  • + learn more
Pest Control Branch 2 Guaranteed Success
  • Pest Control Branch 2 Guaranteed Success

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Pest Control Branch 2 Guaranteed Success a centipede can be described as having ️elongated, flattened, with one pair of legs per body segment a centipede used what to inject poison? ️fangs a customer is on a quarterly exterior maintenance program. which pesticide formulation should be used for an effective barrier treatment ️wettable powder a field representative renews their license every how many years ️3 a major structural pest in California is the ️roof rat a paper wasp nes...
    (0)
  • $9.99
  • 1x sold
  • + learn more
NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64 RATED A+
  • NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64 RATED A+

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NEW YORK INDEPENDENT FIRE ADJUSTER EXAM SIMULATOR - SERIES 17-64 RATED A+ Mason has suffered a $42,000 loss to his commercial building due to fire. The building is covered under the Building & Personal Property coverage form and had been vacant for 74 days. The insurer would have paid the entire loss if the building had been occupied, but what will they pay because the insured building was considered vacant? $28,980. $42,000. $6,300. $35,700. For a loss that would otherwise be covered for th...
    (0)
  • $9.99
  • 1x sold
  • + learn more