Cosc 153 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 153? On this page you'll find 123 study documents about Cosc 153.

Page 2 out of 123 results

Sort by

COSC 153 Final QUESTIONS & ANSWERS(RATED A)
  • COSC 153 Final QUESTIONS & ANSWERS(RATED A)

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • The Project Phases - ANSWER - Design - Pre-Construction - Procurement - Construction - Post-Construction - Owner Occupancy Phase 1 of Construction - ANSWER Demolition Phase 1 - Demolition - ANSWER - Demo of existing utilities - Demo of physical buildings - Demo of landscaping or other physical pieces - Clearance of land - Subgrade
    (0)
  • $11.99
  • + learn more
COSC 153 EXAM Questions  &Correct Answers
  • COSC 153 EXAM Questions &Correct Answers

  • Exam (elaborations) • 96 pages • 2024
  • COSC 153 EXAM Questions &Correct Answers Process of Becoming an Architect - ANSWER Three Typical Requirements: •Education: Compete NAAB-accredited professional architectural degree program (B.Arch or M.Arch). •Experience: Complete Intern Development Program (IDP) through work with a registered architect and/or other approved work settings. •Examination: Complete and Pass the Architecture Registration Examination (ARE). This is a 7-part computerized national examination. R...
    (0)
  • $15.99
  • + learn more
COSC 153 Final Test Questions and Answers All Correct
  • COSC 153 Final Test Questions and Answers All Correct

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • COSC 153 Final Test Questions and Answers All Correct Which activities fall under the category of quality assurance? - Performing a sample test of 10% of the alarm devices - Checking every concrete delivery ticket to ensure the mix matches specifications - Spot checking a subcontractor's inspection checklist - Flooding a roof with water to see if it leaks. - Answer-Performing a sample test of 10% of the alarm devices. Checking every concrete delivery ticket to ensure the mix matches ...
    (0)
  • $12.99
  • + learn more
COSC 153 FINAL EXAM Questions And Answers With Verified Solutions Graded A+
  • COSC 153 FINAL EXAM Questions And Answers With Verified Solutions Graded A+

  • Exam (elaborations) • 30 pages • 2024
  • •Construction Quality is one of projects most important aspects - •Owner Quality •Vendor Quality •Contractor Quality •Subcontractor Quality •Quantity Survey vs. Quality Inspection vs. Quality Assurance - •Who are the players •Shared Roles •Motivation for approval of QC items / conflict of interest possibilities Administering the Contract - •Managing all the business affairs related to the contract parties and their obligations. This involves the efforts of many manage...
    (0)
  • $7.99
  • + learn more
COSC 153 Midterm Exam Questions With Verified Solutions
  • COSC 153 Midterm Exam Questions With Verified Solutions

  • Exam (elaborations) • 19 pages • 2024
  • COSC 153 Midterm Exam Questions With Verified Solutions Aggregate - answerMixture of sand and stone & is a major component of concrete Architect - answerOne who has completed a course of study in building and design and draws up plans Backing - answerFrame lumber or metal installed between the wall studs to give additional support for drywall or an interior trim related item (such as handrail brackets, cabinets, towel bars). Items are screwed and mounted into solid wood or metal rather th...
    (0)
  • $12.49
  • + learn more
COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT).
  • COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT).

  • Exam (elaborations) • 21 pages • 2023
  • Available in package deal
  • COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT). Prehistoric Homes correct answers •First homes where done with branches, bones, stones and animal fur Prehistoric Construction correct answers •Major Historical Construction projects were always Religious based Bronze Age Construction Homes correct answers •Bronze Age homes were much more advanced and involved precision cut wood members such as columns and beams and roofs mostly made of Construction in Egypt correct answers ...
    (0)
  • $12.99
  • + learn more
COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT).
  • COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT).

  • Exam (elaborations) • 21 pages • 2023
  • Available in package deal
  • COSC 153 FINAL EXAM QUESTIONS AND ANSWERS (100% CORRECT). Prehistoric Homes correct answers •First homes where done with branches, bones, stones and animal fur Prehistoric Construction correct answers •Major Historical Construction projects were always Religious based Bronze Age Construction Homes correct answers •Bronze Age homes were much more advanced and involved precision cut wood members such as columns and beams and roofs mostly made of Construction in Egypt correct answers ...
    (0)
  • $11.99
  • + learn more
COSC 153 Midterm Exam Questions With Verified Solutions
  • COSC 153 Midterm Exam Questions With Verified Solutions

  • Exam (elaborations) • 19 pages • 2024
  • COSC 153 Midterm Exam Questions With Verified Solutions Aggregate - answerMixture of sand and stone & is a major component of concrete Architect - answerOne who has completed a course of study in building and design and draws up plans Backing - answerFrame lumber or metal installed between the wall studs to give additional support for drywall or an interior trim related item (such as handrail brackets, cabinets, towel bars). Items are screwed and mounted into solid wood or metal rather th...
    (0)
  • $12.49
  • + learn more
Cooke-s Cumulative COSC 153 FINAL Exam fully solved & updated(passed).
  • Cooke-s Cumulative COSC 153 FINAL Exam fully solved & updated(passed).

  • Exam (elaborations) • 15 pages • 2024
  • Cooke-s Cumulative COSC 153 FINAL Exam fully solved & updated(passed).
    (0)
  • $13.99
  • + learn more
COSC 153 Final Exam 2 (100% Accurate Answers).
  • COSC 153 Final Exam 2 (100% Accurate Answers).

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • COSC 153 Final Exam 2 (100% Accurate Answers). The Project Phases correct answers - Design - Pre-Construction - Procurement - Construction - Post-Construction - Owner Occupancy Phase 1 of Construction correct answers Demolition Phase 1 - Demolition correct answers - Demo of existing utilities - Demo of physical buildings - Demo of landscaping or other physical pieces - Clearance of land - Subgrade Phase 2 of Construction correct answers Excavation and Foundations (Sub-Structure) P...
    (0)
  • $10.99
  • + learn more